Prevailing wage rates in Washtenaw County, MI
Davis-Bacon rates as of June 25, 2026, in the Ann Arbor, MI BLS area
Electricians on federal building jobs in Washtenaw County must be paid at least $56.05 an hour plus $30.52 an hour in fringe benefits (MI20260100, modification 1, published May 18, 2026). Washtenaw County has 6 active determinations covering building, residential, highway and heavy construction; every rate is below.
Prevailing rate vs. market pay
The Davis-Bacon package (rate plus fringe) across the county's determinations, beside what the trade earns in the area according to the BLS (May 2025 median hourly wage for the metro).
| Trade | Davis-Bacon package | BLS median |
|---|---|---|
| Electricians | $59.61 – $86.57 | $39.16 an hour |
| Plumbers and pipefitters | $36.47 – $87.52 | $37.60 an hour |
| Carpenters | $44.95 – $73.87 | $31.33 an hour |
| Power equipment operators | $42.45 – $83.67 | $30.05 an hour |
| Ironworkers | $26.41 – $72.48 | not published |
| Roofers | $64.29 | $29.68 an hour |
Building construction
Determination MI20260100, modification 1, published May 18, 2026. 47 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIAN | $56.05 | $30.52 | $86.57 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $51.30 | $25.87 | $77.17 | Union |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC… | $51.30 | $25.87 | $77.17 | Union |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $53.57 | $33.95 | $87.52 | Union |
| Carpenters | ||||
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD… | $42.44 | $31.43 | $73.87 | Union |
| CARPENTER (FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING) | $36.76 | $21.11 | $57.87 | Union |
| Laborers | ||||
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 | $27.71 | $9.10 | $36.81 | Union |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 | $29.93 | $9.10 | $39.03 | Union |
| LABORER: PIPELAYER | $38.47 | $15.45 | $53.92 | Union |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $38.11 | $15.45 | $53.56 | Union |
| Power equipment operators | ||||
| OPERATOR: POWER EQUIPMENT: GROUP9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRI… | $35.29 | $25.35 | $60.64 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP8 FORKLIFT & EXTEND-A-BOOM FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.2… | $43.63 | $25.35 | $68.98 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, ROLLER, SCRAPER, TRACTOR & TRENCHER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINE… | $45.34 | $25.35 | $70.69 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MO… | $46.31 | $25.35 | $71.66 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $47.17 | $25.35 | $72.52 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $47.99 | $25.35 | $73.34 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $48.29 | $25.35 | $73.64 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $48.79 | $25.35 | $74.14 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $51.29 | $25.35 | $76.64 | Union |
| Ironworkers | ||||
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | Union |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 | Survey |
| Sheet metal workers | ||||
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $42.51 | $35.77 | $78.28 | Union |
| Painters | ||||
| PAINTER: SPRAY | $26.86 | $17.66 | $44.52 | Union |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 | $53.26 | Union |
| PAINTER: SPRAY | $26.86 | $17.66 | $44.52 | Union |
| PAINTER: BRUSH AND ROLLER | $32.85 | $20.41 | $53.26 | Union |
| Roofers | ||||
| ROOFER | $42.67 | $21.62 | $64.29 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $32.23 | $22.11 | $54.34 | Union |
| Bricklayers | ||||
| BRICKLAYER | $40.71 | $28.21 | $68.92 | Union |
| BRICKLAYER | $40.71 | $28.21 | $68.92 | Union |
| Truck drivers | ||||
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 | Survey |
| TRUCK DRIVER: GROUP 3per dayLOWBOY PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND… | $31.28 | $0.70 | $31.98 | Union |
| TRUCK DRIVER: GROUP 2per daySEMI PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, … | $31.18 | $0.70 | $31.88 | Union |
| TRUCK DRIVER: GROUP 1per dayFLATBED; PICKUP; DUMP & TANDEM PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CO… | $31.03 | $0.70 | $31.73 | Union |
Every other classification (13)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ANN ARBOR… | $40.74 | $32.59 | $73.33 | Union |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF… | $40.00 | $23.65 | $63.65 | Union |
| BOILERMAKER | $43.50 | $36.74 | $80.24 | Union |
| TILE SETTER | $40.53 | $23.62 | $64.15 | Union |
| TILE FINISHER | $33.50 | $23.52 | $57.02 | Union |
| TILE SETTER | $40.53 | $23.62 | $64.15 | Union |
| TILE FINISHER | $33.50 | $23.52 | $57.02 | Union |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | Union |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | Union |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | Union |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 | $53.26 | Union |
| PAINTER: DRYWALL FINISHING/TAPING | $32.85 | $20.41 | $53.26 | Union |
| GLAZIERPAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE F… | $42.00 | $25.55 | $67.55 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Residential construction
Determination MI20260024, modification 1, published May 18, 2026. 28 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIAN | $39.26 | $20.35 | $59.61 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $42.26 | $23.70 | $65.96 | Union |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $44.31 | $23.70 | $68.01 | Union |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $42.26 | $23.70 | $65.96 | Union |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $44.31 | $23.70 | $68.01 | Union |
| Carpenters | ||||
| CARPENTER (SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS) | $29.19 | $15.76 | $44.95 | Union |
| CARPENTER (MULTI-FAMILY CONDOMINIUMS) | $31.58 | $16.27 | $47.85 | Union |
| Laborers | ||||
| LANDSCAPE LABORER: GROUP 2 | $27.71 | $9.10 | $36.81 | Union |
| LANDSCAPE LABORER: GROUP 1 | $29.93 | $9.10 | $39.03 | Union |
| LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | Survey |
| LABORER: COMMON OR GENERAL | $15.58 | $5.46 | $21.04 | Survey |
| Power equipment operators | ||||
| OPERATOR: POWER EQUIPMENT: GROUP7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST… | $45.34 | $25.35 | $70.69 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR … | $46.31 | $25.35 | $71.66 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $47.17 | $25.35 | $72.52 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $47.99 | $25.35 | $73.34 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $48.29 | $25.35 | $73.64 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $49.79 | $25.35 | $75.14 | Union |
| OPERATOR: POWER EQUIPMENT: GROUP1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WOR… | $51.29 | $25.35 | $76.64 | Union |
| Ironworkers | ||||
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 | Union |
| Sheet metal workers | ||||
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $28.67 | $9.50 | $38.17 | Union |
| Painters | ||||
| PAINTER: BRUSH AND ROLLER | $20.14 | $14.72 | $34.86 | Union |
| Roofers | ||||
| ROOFER | $42.67 | $21.62 | $64.29 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 | $25.12 | Survey |
| Truck drivers | ||||
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 | Survey |
| TRUCK DRIVER: PICKUPper dayPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WO… | $31.03 | $0.70 | $31.73 | Union |
Every other classification (3)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ANN ARBOR… | $40.74 | $32.59 | $73.33 | Union |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF… | $40.00 | $23.65 | $63.65 | Union |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Highway construction
Determination MI20260001, modification 3, published June 25, 2026. 213 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Plumbers and pipefitters | ||||
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: WELDING IN… | $33.03 | $20.19 | $53.22 | Union |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: ALL OTHER WORK | $24.19 | $12.28 | $36.47 | Union |
| Carpenters | ||||
| CARPENTER: PILEDRIVER (REMAINDER OF STATE) | $35.57 | $21.54 | $57.11 | Union |
| CARPENTER: PILEDRIVER (LIVINGSTON (TOWNSHIPS OF BRIGHTON… | $41.37 | $28.69 | $70.06 | Union |
| Laborers | ||||
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C… | $26.21 | $16.62 | $42.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $24.75 | $16.35 | $41.10 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVEL A, B, C. (OAKLAND… | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (MONROE… | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (MACOMB… | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $28.93 | $14.20 | $43.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C… | $29.93 | $14.20 | $44.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C… | $27.13 | $14.95 | $42.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $24.17 | $12.90 | $37.07 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $23.20 | $13.80 | $37.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C… | $24.20 | $13.80 | $38.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C… | $26.33 | $12.95 | $39.28 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $24.64 | $12.90 | $37.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (ARENAC… | $23.74 | $12.95 | $36.69 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $20.80 | $12.90 | $33.70 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $20.80 | $12.90 | $33.70 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C… | $21.88 | $13.26 | $35.14 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B, OR C (ALGER… | $25.18 | $12.90 | $38.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $22.58 | $12.90 | $35.48 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B, OR C (ALCONA… | $17.45 | $12.75 | $30.20 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS B (ALCONA, ALPENA… | $18.64 | $12.90 | $31.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: WORK PERFORMED IN… | $16.45 | $12.75 | $29.20 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS A (ALCONA, ALPENA… | $17.64 | $12.90 | $30.54 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1 | $30.13 | $22.75 | $52.88 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2 | $32.13 | $22.75 | $54.88 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $28.13 | $22.75 | $50.88 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 4SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $23.97 | $16.93 | $40.90 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 5SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $24.22 | $16.93 | $41.15 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 6SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $24.55 | $16.93 | $41.48 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 7SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $17.83 | $16.93 | $34.76 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $32.13 | $17.95 | $50.08 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2 | $34.40 | $17.95 | $52.35 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $28.00 | $17.45 | $45.45 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 4SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $29.57 | $16.93 | $46.50 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 5SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION… | $25.76 | $16.93 | $42.69 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 6 | $26.07 | $16.93 | $43.00 | Union |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 7 | $25.57 | $16.93 | $42.50 | Union |
| LABORERS - OPEN CUT: GROUP 1FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $29.98 | $22.75 | $52.73 | Union |
| LABORERS - OPEN CUT: GROUP 2SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $31.98 | $22.75 | $54.73 | Union |
| LABORERS - OPEN CUT: GROUP 3SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $28.14 | $22.75 | $50.89 | Union |
| LABORERS - OPEN CUT: GROUP 4SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $23.71 | $16.72 | $40.43 | Union |
| LABORERS - OPEN CUT: GROUP 5FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $24.17 | $16.72 | $40.89 | Union |
| LABORERS - OPEN CUT: GROUP 6FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $22.00 | $16.72 | $38.72 | Union |
| LABORERS - OPEN CUT: GROUP 7SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $17.84 | $16.72 | $34.56 | Union |
| LABORERS - OPEN CUT: GROUP 1SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $32.10 | $17.45 | $49.55 | Union |
| LABORERS - OPEN CUT: GROUP 2FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $34.10 | $17.45 | $51.55 | Union |
| LABORERS - OPEN CUT: GROUP 3SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $30.10 | $17.45 | $47.55 | Union |
| LABORERS - OPEN CUT: GROUP 4SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $25.10 | $16.72 | $41.82 | Union |
| LABORERS - OPEN CUT: GROUP 5SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $25.25 | $16.72 | $41.97 | Union |
| LABORERS - OPEN CUT: GROUP 6SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $22.55 | $16.72 | $39.27 | Union |
| LABORERS - OPEN CUT: GROUP 7SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $22.11 | $16.72 | $38.83 | Union |
| LABORERS - OPEN CUT: GROUP 1SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $30.29 | $17.45 | $47.74 | Union |
| LABORERS - OPEN CUT: GROUP 2SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $32.29 | $17.45 | $49.74 | Union |
| LABORERS - OPEN CUT: GROUP 3SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $28.29 | $17.45 | $45.74 | Union |
| LABORERS - OPEN CUT: GROUP 4SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $23.30 | $16.72 | $40.02 | Union |
| LABORERS - OPEN CUT: GROUP 5SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $23.44 | $16.72 | $40.16 | Union |
| LABORERS - OPEN CUT: GROUP 6FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $20.74 | $16.72 | $37.46 | Union |
| LABORERS - OPEN CUT: GROUP 7SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $22.23 | $16.72 | $38.95 | Union |
| LABORERS - OPEN CUT: GROUP 1FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $28.72 | $18.45 | $47.17 | Union |
| LABORERS - OPEN CUT: GROUP 2FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $30.72 | $18.45 | $49.17 | Union |
| LABORERS - OPEN CUT: GROUP 3FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $26.72 | $18.45 | $45.17 | Union |
| LABORERS - OPEN CUT: GROUP 4FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $22.33 | $16.72 | $39.05 | Union |
| LABORERS - OPEN CUT: GROUP 5FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL … | $22.45 | $16.72 | $39.17 | Union |
| LABORERS - OPEN CUT: GROUP 6SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $19.67 | $16.72 | $36.39 | Union |
| LABORERS - OPEN CUT: GROUP 7SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $22.30 | $16.72 | $39.02 | Union |
| LABORERS - OPEN CUT: GROUP 1SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $29.98 | $22.75 | $52.73 | Union |
| LABORERS - OPEN CUT: GROUP 2SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $30.09 | $19.45 | $49.54 | Union |
| LABORERS - OPEN CUT: GROUP 3SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $26.09 | $19.45 | $45.54 | Union |
| LABORERS - OPEN CUT: GROUP 4CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARAT… | $22.56 | $16.72 | $39.28 | Union |
| LABORERS - OPEN CUT: GROUP 5CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARAT… | $22.34 | $16.72 | $39.06 | Union |
| LABORERS - OPEN CUT: GROUP 6SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $19.99 | $16.72 | $36.71 | Union |
| LABORERS - OPEN CUT: GROUP 7SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, … | $22.45 | $16.72 | $39.17 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4 | $34.51 | $13.45 | $47.96 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4 | $34.08 | $13.45 | $47.53 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4 | $34.46 | $13.45 | $47.91 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4 | $34.02 | $13.45 | $47.47 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4 | $33.73 | $13.45 | $47.18 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4 | $33.52 | $13.45 | $46.97 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3 | $33.61 | $14.45 | $48.06 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3 | $33.18 | $14.45 | $47.63 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3 | $33.56 | $14.45 | $48.01 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3 | $33.12 | $14.45 | $47.57 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3 | $33.83 | $14.45 | $48.28 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3 | $32.62 | $14.45 | $47.07 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2 | $34.37 | $14.45 | $48.82 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2 | $34.03 | $14.45 | $48.48 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2 | $34.16 | $14.45 | $48.61 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2 | $33.81 | $14.45 | $48.26 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2 | $30.03 | $14.45 | $44.48 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2 | $33.37 | $14.45 | $47.82 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1 | $36.41 | $14.45 | $50.86 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1 | $36.11 | $14.45 | $50.56 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1 | $35.90 | $14.45 | $50.35 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1 | $35.82 | $14.45 | $50.27 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1 | $31.96 | $14.45 | $46.41 | Union |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1 | $35.51 | $14.45 | $49.96 | Union |
| LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION…UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $22.95 | $13.45 | $36.40 | Union |
| LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION…UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $22.92 | $13.45 | $36.37 | Union |
| LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION…UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $23.55 | $13.45 | $37.00 | Union |
| LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION…UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $24.55 | $13.45 | $38.00 | Union |
| LABORER: DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION…UNDERGROUND DUCT LAYER PAY: $.40 PER HOUR ABOVE THE BASE PAY RATE | $28.41 | $13.45 | $41.86 | Union |
| Power equipment operators | ||||
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 18FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.78 | $28.25 | $64.03 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 17FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.29 | $15.40 | $47.69 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 16FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $46.77 | $28.25 | $75.02 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 15FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.97 | $28.25 | $78.22 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 11FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.97 | $28.25 | $79.22 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 7FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.15 | $28.25 | $80.40 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.42 | $28.25 | $80.67 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.92 | $28.25 | $82.17 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $55.42 | $28.25 | $83.67 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $35.78 | $28.25 | $64.03 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6-OILERFOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $35.78 | $28.25 | $64.03 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5-AIRFOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $32.29 | $15.40 | $47.69 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5-AIRFOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $32.29 | $15.40 | $47.69 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $46.77 | $28.25 | $75.02 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $46.77 | $28.25 | $75.02 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $50.61 | $28.25 | $78.86 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $50.61 | $28.25 | $78.86 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $30.35 | $12.10 | $42.45 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $30.35 | $12.10 | $42.45 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $39.95 | $25.25 | $65.20 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $39.95 | $25.25 | $65.20 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $40.52 | $25.25 | $65.77 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $40.52 | $25.25 | $65.77 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $41.25 | $25.25 | $66.50 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $41.25 | $25.25 | $66.50 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $45.98 | $25.25 | $71.23 | Union |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY… | $37.77 | $25.25 | $63.02 | Union |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY… | $38.33 | $25.25 | $63.58 | Union |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY… | $46.21 | $25.25 | $71.46 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR OPERATOR… | $47.12 | $25.00 | $72.12 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER AND FIREMAN… | $41.76 | $25.00 | $66.76 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANIC WITH TRUCK… | $48.90 | $25.00 | $73.90 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRESSOR, WELDER… | $43.30 | $25.00 | $68.30 | Union |
| OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 2 | $35.33 | $15.44 | $50.77 | Union |
| OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 1 | $37.37 | $15.44 | $52.81 | Union |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT…TAMPER (SELF-PROPELLED), BOOM TRUCK (WITH NON-POWERED BOOM), CONCRETE SAW (20 HP OR LARGER), PUMPS (2 TO 4 UNDER 6-INCH DISCHARGE), COMPRESSOR (2 OR MORE OR WHEN ONE IS USED CONTINUOUSLY INTO THE SECOND DAY) AND TRENCHER… | $36.05 | $25.25 | $61.30 | Union |
| Ironworkers | ||||
| IRONWORKERGENERAL CONTRACTS LESS THAN $10,000,000 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DA… | $39.91 | $32.32 | $72.23 | Union |
| IRONWORKERGENERAL CONTRACTS $10,000,000 OR GREATER (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S D… | $39.91 | $32.32 | $72.23 | Union |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR (ALGER…PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $23.70 | $6.95 | $30.65 | Union |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL (ALCONA, ALPENA, ARENAC… | $36.55 | $35.93 | $72.48 | Union |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: BAY… | $30.02 | $28.13 | $58.15 | Union |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: ALLEGAN… | $28.80 | $27.43 | $56.23 | Union |
| IRONWORKER: PRE-ENGINEERED METAL BUILDINGS (LENAWEE AND MONROE… | $23.59 | $19.35 | $42.94 | Union |
| IRONWORKER: ALL OTHER WORK (LENAWEE AND MONROE COUNTIES) | $33.00 | $27.20 | $60.20 | Union |
| IRONWORKER: INCLUDING PRE-ENGINEERED METAL BUILDING ERECTOR… | $31.75 | $22.84 | $54.59 | Union |
| Painters | ||||
| PAINTER (HILLSDALE, JACKSON AND LENAWEE COUNTIES; LIVINGSTON…FOOTNOTES: FOR ALL SPRAY WORK AND JOURNEYMAN RIGGING FOR SPRAY WORK, ALSO BLOWING OFF, $0.80 PER HOUR ADDITIONAL (APPLIES ONLY TO WORKERS DOING RIGGING FOR SPRAY WORK ON OFF THE FLOOR WORK. DOES NOT INCLUDE SETTING UP OR… | $25.06 | $14.75 | $39.81 | Union |
| PAINTER: SPRAY, SANDBLAST, SIGN PAINTING (EXCLUDES: ALLEGAN… | $24.94 | $13.35 | $38.29 | Union |
| PAINTER: BRUSH AND ROLLER (EXCLUDES: ALLEGAN COUNTY (TOWNSHIPS… | $23.74 | $13.35 | $37.09 | Union |
| PAINTER (CLINTON COUNTY; EATON COUNTY (DOES NOT INCLUDE THE… | $25.49 | $13.74 | $39.23 | Union |
| PAINTER (MUSKEGON COUNTY; NEWAYGO COUNTY (EXCEPT THE TOWNSHIPS… | $25.49 | $13.74 | $39.23 | Union |
| PAINTER (ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH… | $25.49 | $13.74 | $39.23 | Union |
| PAINTER (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC…FOOTNOTES: HIGH PAY (BRIDGES, OVERPASSES, WATERTOWER): 30 TO 80 FT.: $.65 PER HOUR ADDITIONAL. 80 FT. AND OVER: $1.30 PER HOUR ADDITIONAL | $24.66 | $14.99 | $39.65 | Union |
| PAINTER (HURON COUNTY; LAPEER COUNTY (EAST OF HWY. M-53); ST…FOOTNOTES: LEAD ABATEMENT WORK: $1.00 PER HOUR ADDITIONAL. WORK WITH ANY HAZARDOUS MATERIAL: $1.00 PER HOUR ADDITIONAL. SANDBLASTING, STEAM CLEANING AND ACID CLEANING: $1.00 PER HOUR ADDITIONAL. LADDER WORK AT OR ABOVE 4… | $23.79 | $12.02 | $35.81 | Union |
| PAINTER: WORK PERFORMED ON WATER, BRIDGES OVER WATER OR MOVING… | $29.23 | $19.11 | $48.34 | Union |
| PAINTER: ALL OTHER WORK, INCLUDING MAINTENANCE OF INDUSTRIAL…FOOTNOTES: SPRAY PAINTING, SANDBLASTING, BLOWDOWN ASSOCIATED WITH SPRAYING AND BLASTING, WATER BLASTING AND WORK INVOLVING A SWING STAGE, BOATSWAIN CHAIR OR SPIDER: $1.00 PER HOUR ADDITIONAL. ALL WORK PERFORMED INSIDE TA… | $29.35 | $19.05 | $48.40 | Union |
| PAVEMENT MARKING MACHINE: GROUP 2Performs all functions involved for the placement or removal of temporary or permanent pavement markings or markers not covered by the classification of Pavement Marker Group 1 or Line Protector. ZONE 2: STATEWIDE (EXCLU… | $30.03 | $14.45 | $44.48 | Survey |
| PAVEMENT MARKING MACHINE: GROUP 2 | $31.96 | $14.45 | $46.41 | Survey |
| PAVEMENT MARKING MACHINE: GROUP 1 (EXCLUDING GENESEE, MACOMB…Drives or operates a truck mounted striper, grinder, blaster, groover, or thermoplastic melter for the placement or removal of temporary or permanent pavement markings or markers. ZONE 2: STATEWIDE | $33.37 | $14.45 | $47.82 | Survey |
| PAVEMENT MARKING MACHINE: GROUP 1Drives or operates a truck mounted striper, grinder, blaster, groover, or thermoplastic melter for the placement or removal of temporary or permanent pavement markings or markers. ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND… | $35.51 | $14.45 | $49.96 | Survey |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER: ZONE 2 (ALCONA, ALGER, ALLEGAN… | $31.50 | $18.51 | $50.01 | Union |
| CEMENT MASON/CONCRETE FINISHER: ZONE 1 (GENESEE, LIVINGSTON… | $33.00 | $18.51 | $51.51 | Union |
| Truck drivers | ||||
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER (AREA 2FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.50 | $0.75 | $34.25 | Union |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER (AREA 1FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.40 | $0.75 | $34.15 | Union |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS. (AREA 2FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.50 | $0.75 | $34.25 | Union |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS. (AREA 1FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.40 | $0.75 | $34.15 | Union |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS (AREA 2FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.65 | $0.75 | $34.40 | Union |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS (AREA 1FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | Union |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3SCOPE OF WORK: EXCAATION, SITE PREPARATION, LAND BALANCING, GRADING, SEWERS, UTILITIES AND IMPROVEMENTS; ALSO INCLUDING BUT NOT LIMITED TO TUNNELS, UNDERGROUND PIPING, RETENTION, OXIDATION, FLOCCULATION FACILITIES, CONDU… | $24.45 | $19.04 | $43.49 | Union |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3SCOPE OF WORK: EXCAATION, SITE PREPARATION, LAND BALANCING, GRADING, SEWERS, UTILITIES AND IMPROVEMENTS; ALSO INCLUDING BUT NOT LIMITED TO TUNNELS, UNDERGROUND PIPING, RETENTION, OXIDATION, FLOCCULATION FACILITIES, CONDU… | $24.12 | $19.04 | $43.16 | Union |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, TANKSGIVING DAY, AND CHRISTMAS DAY | $24.26 | $19.04 | $43.30 | Union |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, TANKSGIVING DAY, AND CHRISTMAS DAY | $23.91 | $19.04 | $42.95 | Union |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, TANKSGIVING DAY, AND CHRISTMAS DAY | $24.12 | $19.04 | $43.16 | Union |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, TANKSGIVING DAY, AND CHRISTMAS DAY | $23.82 | $19.04 | $42.86 | Union |
Every other classification (32)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| LINE CONSTRUCTION: OPERATOR B(SHALL BE PROFICIENT IN OPERATING ANY 2 OF THE ABOVE MENTIONED PIECES OF EQUIPMENT LISTED UNDER OPERATOR A.) | $38.98 | $20.26 | $59.24 | Union |
| LINE CONSTRUCTION: OPERATOR A(SHALL BE PROFICIENT IN OPERATING ALL POWER EQUIPMENT INCLUDING: BACKHOE, EXCAVATOR, DIRECTIONAL BORE AND BOOM/DIGGER TRUCK.) | $41.71 | $21.16 | $62.87 | Union |
| LINE CONSTRUCTION: JOURNEYMAN SPECIALIST JOURNEYMAN SPECIALIST… | $56.65 | $26.09 | $82.74 | Union |
| LINE CONSTRUCTION: JOURNEYMAN SIGNAL TECH, COMMUNICATIONS TECH… | $49.26 | $23.66 | $72.92 | Union |
| LINE CONSTRUCTION: GROUNDMAN/DRIVER | $33.32 | $18.40 | $51.72 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 14FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.61 | $28.25 | $79.86 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 13AND 3 DRUM HOIST AND EXCAVATOR (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, … | $50.61 | $28.25 | $78.86 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 12FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.97 | $28.25 | $80.22 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 10FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.70 | $28.25 | $80.95 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.70 | $28.25 | $79.95 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 8FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.15 | $28.25 | $81.40 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.42 | $28.25 | $81.67 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $54.92 | $28.25 | $83.17 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $56.42 | $28.25 | $84.67 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $52.15 | $28.25 | $80.40 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $52.15 | $28.25 | $80.40 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $55.02 | $28.25 | $83.27 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S D… | $55.02 | $28.25 | $83.27 | Union |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION (INCLUDING… | $45.98 | $25.25 | $71.23 | Union |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY… | $45.06 | $25.25 | $70.31 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN… | $50.66 | $25.00 | $75.66 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN… | $50.07 | $24.60 | $74.67 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN… | $49.77 | $25.00 | $74.77 | Union |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT…SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDI… | $39.78 | $25.25 | $65.03 | Union |
| IRONWORKER: REINFORCING (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN… | $36.55 | $32.87 | $69.42 | Union |
| LINE PROTECTOR: Performs all operations for the protection or… | $25.03 | $14.45 | $39.48 | Survey |
| LINE PROTECTOR (ZONE 1Performs all operations for the protection or removal of temporary or permanent pavement markings or markers in a moving convoy operation not performed by the classification of Pavement Marker Group 1. A moving convoy op… | $26.63 | $14.45 | $41.08 | Survey |
| FLAG PERSON | $10.10 | $0.00 | $10.10 | Survey |
| SIGN INSTALLER GROUP 2per day$132.70 PER WEEK, PLUS $17.80 PER DAY | $25.05 | $11.84 | $36.89 | Union |
| SIGN INSTALLER GROUP 2per day$132.70 PER WEEK, PLUS $17.80 PER DAY | $25.27 | $11.84 | $37.11 | Union |
| SIGN INSTALLER GROUP 1per day$132.70 PER WEEK, PLUS $17.80 PER DAY | $22.03 | $11.83 | $33.86 | Union |
| SIGN INSTALLER GROUP 1per day$132.70 PER WEEK, PLUS $17.80 PER DAY | $21.78 | $11.83 | $33.61 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Heavy construction (MI20260074)
Determination MI20260074, modification 1, published May 18, 2026. 35 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIAN | $56.05 | $30.52 | $86.57 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER | $44.31 | $23.70 | $68.01 | Union |
| Carpenters | ||||
| CARPENTER, INCLUDES FORM WORK | $42.44 | $31.43 | $73.87 | Union |
| Laborers | ||||
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 | $27.71 | $9.10 | $36.81 | Union |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 | $29.93 | $9.10 | $39.03 | Union |
| LABORER ((7) LANDSCAPE) | $19.59 | $12.95 | $32.54 | Union |
| LABORER ((524.20) PIPELAYER) | $25.65 | $12.95 | $38.60 | Union |
| LABORER ((4) GRADE CHECKER) | $25.50 | $12.95 | $38.45 | Union |
| LABORER ((1) COMMON OR GENERAL) | $25.20 | $12.95 | $38.15 | Union |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 3 | $38.47 | $15.45 | $53.92 | Union |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 1 | $38.11 | $15.45 | $53.56 | Union |
| Power equipment operators | ||||
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING… | $39.95 | $25.25 | $65.20 | Union |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING… | $40.52 | $25.25 | $65.77 | Union |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING… | $41.25 | $25.25 | $66.50 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $35.29 | $25.35 | $60.64 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…8 FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $43.63 | $25.35 | $68.98 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE CO… | $45.34 | $25.35 | $70.69 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $46.31 | $25.35 | $71.66 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.17 | $25.35 | $72.52 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.99 | $25.35 | $73.34 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $48.29 | $25.35 | $73.64 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $49.79 | $25.35 | $75.14 | Union |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION…1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $51.29 | $25.35 | $76.64 | Union |
| Ironworkers | ||||
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | Union |
| Painters | ||||
| PAINTER: SPRAY | $25.86 | $14.75 | $40.61 | Union |
| PAINTER: BRUSH & ROLLER | $25.06 | $14.75 | $39.81 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $32.23 | $22.11 | $54.34 | Union |
| Truck drivers | ||||
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 | Survey |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.65 | $0.75 | $34.40 | Union |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER | $33.50 | $0.75 | $34.25 | Union |
| TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCKFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.40 | $0.75 | $34.15 | Union |
Every other classification (4)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING… | $45.98 | $25.25 | $71.23 | Union |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | Union |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.11 | $12.95 | $35.06 | Union |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 2 | $38.33 | $15.45 | $53.78 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Heavy construction (MI20260157)
Determination MI20260157, modification 1, published May 18, 2026. 7 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Laborers | ||||
| LABORER: DISTRIBUTION WORK: ZONE 5DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROP… | $22.95 | $13.45 | $36.40 | Union |
| LABORER: DISTRIBUTION WORK: ZONE 4DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROP… | $22.92 | $13.45 | $36.37 | Union |
| LABORER: DISTRIBUTION WORK: ZONE 3DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROP… | $23.55 | $13.45 | $37.00 | Union |
| LABORER: DISTRIBUTION WORK: ZONE 2DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROP… | $24.55 | $13.45 | $38.00 | Union |
| LABORER: DISTRIBUTION WORK: ZONE 1DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUTION PIPELINES TRANSPORTING COAL, OIL, GAS OR OTHER SIMILAR MATERIALS, VAPORS OR LIQUIDS, INCLUDING PIPELINES WITHIN PRIVATE PROP… | $28.41 | $13.45 | $41.86 | Union |
| Power equipment operators | ||||
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT…TAMPER (SELF-PROPELLED), BOOM TRUCK (WITH NON-POWERED BOOM), CONCRETE SAW (20 HP OR LARGER), PUMPS (2 TO 4 UNDER 6-INCH DISCHARGE), COMPRESSOR (2 OR MORE OR WHEN ONE IS USED CONTINUOUSLY INTO THE SECOND DAY) AND TRENCHER… | $36.05 | $25.25 | $61.30 | Union |
Every other classification (1)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT…SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDI… | $39.78 | $25.25 | $65.03 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Heavy construction (MI20260158)
Determination MI20260158, modification 1, published May 18, 2026. 97 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Laborers | ||||
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE…(LEVELS A, B OR C) | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE…(LEVEL A, B, C) | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4(LEVELS A, B OR C) | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $14.20 | $43.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST…(LEVELS A, B OR C) | $29.93 | $14.20 | $44.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $23.20 | $13.80 | $37.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND…(LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b | $18.64 | $12.90 | $31.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a | $17.64 | $12.90 | $30.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR…(LEVELS A, B OR C) | $26.21 | $16.62 | $42.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND…(LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND…(LEVELS A, B OR C) | $26.33 | $12.95 | $39.28 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE…(LEVELS A, B OR C) | $23.74 | $12.95 | $36.69 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $20.80 | $12.90 | $33.70 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN…(LEVELS A, B OR C) | $21.88 | $13.26 | $35.14 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA…(LEVELS A, B OR C) | $25.18 | $12.90 | $38.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE…(LEVELS A, B OR C) | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE…(LEVEL A, B, C) | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4(LEVELS A, B OR C) | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $14.20 | $43.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST…(LEVELS A, B OR C) | $29.93 | $14.20 | $44.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $23.20 | $13.80 | $37.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND…(LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b | $18.64 | $12.90 | $31.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a | $17.64 | $12.90 | $30.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR…(LEVELS A, B OR C) | $26.21 | $16.62 | $42.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND…(LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND…(LEVELS A, B OR C) | $26.33 | $12.95 | $39.28 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE…(LEVELS A, B OR C) | $23.74 | $12.95 | $36.69 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $20.80 | $12.90 | $33.70 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN…(LEVELS A, B OR C) | $21.88 | $13.26 | $35.14 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA…(LEVELS A, B OR C) | $25.18 | $12.90 | $38.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE…(LEVELS A, B OR C) | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $16.90 | $45.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE…(LEVEL A, B, C) | $29.93 | $16.90 | $46.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4(LEVELS A, B OR C) | $31.75 | $14.90 | $46.65 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $28.93 | $14.20 | $43.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST…(LEVELS A, B OR C) | $29.93 | $14.20 | $44.13 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $23.20 | $13.80 | $37.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND…(LEVELS A, B OR C) | $24.20 | $13.80 | $38.00 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b | $18.64 | $12.90 | $31.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a | $17.64 | $12.90 | $30.54 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR…(LEVELS A, B OR C) | $26.21 | $16.62 | $42.83 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND…(LEVELS A, B OR C) | $27.13 | $14.95 | $42.08 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND…(LEVELS A, B OR C) | $26.33 | $12.95 | $39.28 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE…(LEVELS A, B OR C) | $23.74 | $12.95 | $36.69 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN…WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D | $20.80 | $12.90 | $33.70 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN…(LEVELS A, B OR C) | $21.88 | $13.26 | $35.14 | Union |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA…(LEVELS A, B OR C) | $25.18 | $12.90 | $38.08 | Union |
| Power equipment operators | ||||
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $23.68 | $19.70 | $43.38 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $23.43 | $19.70 | $43.13 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $24.98 | $19.70 | $44.68 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $25.92 | $19.70 | $45.62 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $28.07 | $19.70 | $47.77 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $27.82 | $19.70 | $47.52 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $29.37 | $19.70 | $49.07 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $30.32 | $19.70 | $50.02 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $25.55 | $19.70 | $45.25 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $25.30 | $19.70 | $45.00 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $26.85 | $19.70 | $46.55 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $27.80 | $19.70 | $47.50 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $29.78 | $19.70 | $49.48 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $29.53 | $19.70 | $49.23 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $31.08 | $19.70 | $50.78 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $32.03 | $19.70 | $51.73 | Union |
Every other classification (24)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $29.04 | $19.70 | $48.74 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $28.79 | $19.70 | $48.49 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $30.34 | $19.70 | $50.04 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $31.29 | $19.70 | $50.99 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $31.02 | $19.70 | $50.72 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $30.77 | $19.70 | $50.47 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $32.23 | $19.70 | $51.93 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $33.27 | $19.70 | $52.97 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $30.72 | $19.70 | $50.42 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $30.47 | $19.70 | $50.17 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $31.91 | $19.70 | $51.61 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2 | $32.97 | $19.70 | $52.67 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $32.05 | $19.70 | $51.75 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $30.75 | $19.70 | $50.45 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $29.88 | $19.70 | $49.58 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $33.00 | $19.70 | $52.70 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $32.73 | $19.70 | $52.43 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $32.48 | $19.70 | $52.18 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $34.03 | $19.70 | $53.73 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $34.98 | $19.70 | $54.68 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $32.43 | $19.70 | $52.13 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $32.18 | $19.70 | $51.88 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $33.73 | $19.70 | $53.43 | Union |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1 | $34.68 | $19.70 | $54.38 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Before you rely on a rate
These are federal Davis-Bacon rates for federal and federally assisted construction; state-funded work may follow Michigan's own law. The contracting agency chooses which determination applies, and the one attached to the contract governs, even after a newer modification. Apprentices in registered programs may be paid a percentage of these rates. Nothing here is legal advice.
Source
U.S. Department of Labor, Wage and Hour Division, general wage determinations MI20260100, MI20260024, MI20260001, MI20260074, MI20260157, MI20260158, as published on SAM.gov and refreshed here weekly. Rates are shown exactly as published; the construction types are building, residential, highway, heavy. TradeSalary is not affiliated with the Department of Labor.