TradeSalary

Prevailing wage rates in Providence County, RI

Davis-Bacon rates as of October 1, 2026, in the Providence-Warwick, RI-MA BLS area

Electricians on federal building, highway and heavy jobs in Providence County must be paid at least $56.11 an hour plus $24.74 an hour in fringe benefits (RI20260001, modification 5, published October 1, 2026). Providence County has 3 active determinations covering building, residential, highway and heavy construction; every rate is below.

Prevailing rate vs. market pay

The Davis-Bacon package (rate plus fringe) across the county's determinations, beside what the trade earns in the area according to the BLS (May 2025 median hourly wage for the metro).

TradeDavis-Bacon packageBLS median
Electricians$60.01 – $80.85$35.57 an hour
Plumbers and pipefitters$32.91 – $88.84$38.37 an hour
Carpenters$24.97 – $78.38$29.76 an hour
Power equipment operators$29.25 – $81.25$33.61 an hour
Ironworkers$76.56$47.27 an hour
Roofers$78.93$29.60 an hour

Building, highway and heavy construction

Determination RI20260001, modification 5, published October 1, 2026. 86 classifications.

ClassificationRateFringeTotalBasis
Electricians
ELECTRICIAN(WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20% …$56.11$24.74$80.85Union
Plumbers and pipefitters
PLUMBERS AND PIPEFITTERS$54.34$34.50$88.84Union
SPRINKLER FITTER$53.76$33.44$87.20Union
Carpenters
CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON FREE-STANDING…$47.88$30.50$78.38Union
Laborers
LABORER (BUILDING CONSTRUCTION): GROUP 2$37.00$26.90$63.90Union
LABORER (BUILDING CONSTRUCTION): GROUP 3$37.00$26.90$63.90Union
LABORER (BUILDING CONSTRUCTION): GROUP 4$37.00$26.90$63.90Union
LABORER (BUILDING CONSTRUCTION): GROUP 5$39.00$26.90$65.90Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP…$55.40$24.15$79.55Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP…$52.93$24.15$77.08Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP…$42.45$24.15$66.60Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 1$46.00$24.15$70.15Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 2$45.00$24.15$69.15Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 3$42.45$24.15$66.60Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1$33.05$24.05$57.10Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3$36.50$24.85$61.35Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4$29.00$24.85$53.85Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5$37.50$24.85$62.35Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR CAISSON…$41.50$24.15$65.65Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR CAISSON…$35.60$24.15$59.75Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: DRILLER$41.95$24.15$66.10Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: LABORER$41.95$24.15$66.10Union
Power equipment operators
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…$51.30$29.95$81.25Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $…$49.30$29.95$79.25Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$44.92$29.95$74.87Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$42.07$29.95$72.02Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$48.35$29.95$78.30Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$39.15$29.95$69.10Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…$33.15$29.95$63.10Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$45.00$29.95$74.95Union
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS…(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)$48.92$29.95$78.87Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300…$50.57$29.95$80.52Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP2: DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK. (BOOM LENTHS, IN…$48.57$29.95$78.52Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 27…$48.35$29.95$78.30Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP4: FIREMAN & OILER ON CRANES. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + …$44.35$29.95$74.30Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $…$41.50$29.95$71.45Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP6: BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP…$47.65$29.95$77.60Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP7: WELL POINT INSTALLATION CREW. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER:…$47.22$29.95$77.17Union
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 2…$44.54$29.95$74.49Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)$46.45$29.95$76.40Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY D…$44.45$29.95$74.40Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETE…$39.15$29.95$69.10Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)$25.75$29.95$55.70Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.)$33.15$29.95$63.10Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETE…$39.73$29.95$69.68Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETE…$43.43$29.95$73.38Union
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER…(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETE…$38.70$29.95$68.65Union
Ironworkers
IRONWORKER$43.03$33.53$76.56Union
Sheet metal workers
SHEET METAL WORKER$44.42$41.94$86.36Union
Painters
PAINTER (BRUSH AND ROLLER)$39.57$26.60$66.17Union
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL)$41.57$26.60$68.17Union
PAINTER (SPRAY, SAND & WATER BLASTING)$42.57$26.60$69.17Union
PAINTER (WALL COVERER)$38.57$25.80$64.37Union
PAINTER (BRIDGE WORK)$57.85$26.40$84.25Union
Roofers
ROOFER$47.49$31.44$78.93Union
Cement masons
CEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION) (CEMENT…$44.75$29.10$73.85Union
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION)$40.45$25.30$65.75Union
Bricklayers
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER$46.86$29.14$76.00Union
Truck drivers
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBU…$31.86$34.51$66.37Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP2: TWO-AXLE ON LOW BEDS (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J…$32.01$34.51$66.52Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J …$32.06$34.51$66.57Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-…$32.11$34.51$66.62Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S…$32.21$34.51$66.72Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY &…$32.61$34.51$67.12Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING 2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS…$32.81$34.51$67.32Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS.(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS…$32.31$34.51$66.82Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUM…$32.56$34.51$67.07Union
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DA…$32.36$34.51$66.87Union
Every other classification (18)
ClassificationRateFringeTotalBasis
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING…$49.91$36.63$86.54Union
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL…$49.91$36.63$86.54Union
BOILERMAKER$50.62$28.82$79.44Union
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER$46.54$30.34$76.88Union
MARBLE, TILE & TERRAZZO FINISHER$38.78$29.61$68.39Union
DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE DIVER AND…$60.83$30.50$91.33Union
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER, THE DIVER…$48.68$30.50$79.18Union
PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS &…$41.53$29.35$70.88Union
WELDER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC…$48.68$30.50$79.18Union
MILLWRIGHT$45.72$31.50$77.22Union
TELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS NATURE, OR WHERE…$42.09$19.71$61.80Union
ELEVATOR MECHANIC(ADDTIONAL FRINGE TO BE PAID A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% B…$64.52$38.44$102.96Union
LABORER (BUILDING CONSTRUCTION): GROUP 1$37.00$26.90$63.90Union
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2$35.75$24.85$60.60Union
PAINTER (TAPER)$38.82$25.80$64.62Union
GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONALPAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.)$41.63$26.15$67.78Union
SIGN PAINTER$24.79$13.72$38.51Union
PLASTERER$45.52$29.43$74.95Union

Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.

Residential construction

Determination RI20260002, modification 2, published May 18, 2026. 18 classifications.

ClassificationRateFringeTotalBasis
Electricians
ELECTRICIANFOOTNOTE: WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FEET OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL$42.09$17.92$60.01Union
Plumbers and pipefitters
SPRINKLER FITTER$24.24$9.81$34.05Survey
PLUMBER$23.96$8.95$32.91Survey
Carpenters
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL…$15.32$9.65$24.97Survey
Power equipment operators
POWER EQUIPMENT OPERATOR: PAVERA. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMB…$40.82$28.25$69.07Union
POWER EQUIPMENT OPERATOR: GRADER AND ROLLERA. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMB…$39.90$28.25$68.15Union
POWER EQUIPMENT OPERATOR (BACKHOE)$20.27$8.98$29.25Survey
Painters
PAINTER (BRUSH AND ROLLER)$20.55$8.50$29.05Survey
Roofers
ROOFER$47.49$31.44$78.93Union
Cement masons
CEMENT MASON/FINISHER$20.45$11.40$31.85Survey
Bricklayers
BRICKLAYER$20.45$11.40$31.85Survey
Every other classification (7)
ClassificationRateFringeTotalBasis
INSULATOR - PIPE & PIPEWRAPPER (INCLUDES APPLICATION OF ALL…$49.91$36.63$86.54Union
ELEVATOR MECHANICFOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE F…$64.52$38.44$102.96Union
PLASTERER$13.50$2.45$15.95Survey
LABORER (UNSKILLED, LANDSCAPE, & BRICK MASON TENDER)$18.47$8.10$26.57Survey
INSULATOR - BATT$19.56$9.65$29.21Survey
FLOOR LAYER: CARPET$15.62$9.65$25.27Survey
DRYWALL FINISHER/TAPER$20.55$8.50$29.05Survey

Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.

Heavy construction

Determination RI20260005, modification 2, published May 18, 2026. 7 classifications.

All classifications (7)
ClassificationRateFringeTotalBasis
DREDGING: CLASS DINCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$30.86$14.15$45.01Union
DREDGING: CLASS C2INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$37.15$14.57$51.72Union
DREDGING: CLASS C1INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$38.38$14.66$53.04Union
DREDGING: CLASS B2INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$39.46$14.73$54.19Union
DREDGING: CLASS B1INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$41.93$14.90$56.83Union
DREDGING: CLASS A2INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$43.20$14.99$58.19Union
DREDGING: CLASS A1INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIG…$48.48$15.34$63.82Union

Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.

Before you rely on a rate

These are federal Davis-Bacon rates for federal and federally assisted construction; state-funded work may follow Rhode Island's own law. The contracting agency chooses which determination applies, and the one attached to the contract governs, even after a newer modification. Apprentices in registered programs may be paid a percentage of these rates. Nothing here is legal advice.

Source

U.S. Department of Labor, Wage and Hour Division, general wage determinations RI20260001, RI20260002, RI20260005, as published on SAM.gov and refreshed here weekly. Rates are shown exactly as published; the construction types are building, residential, highway, heavy. TradeSalary is not affiliated with the Department of Labor.