Prevailing wage rates in Tulare County, CA
Davis-Bacon rates as of September 3, 2026, in the Visalia, CA BLS area
Electricians on federal building jobs in Tulare County must be paid at least $50.00 an hour plus $30.15 an hour in fringe benefits (CA20260016, modification 4, published September 3, 2026). Tulare County has 3 active determinations covering building, residential, highway and heavy construction; every rate is below.
Prevailing rate vs. market pay
The Davis-Bacon package (rate plus fringe) across the county's determinations, beside what the trade earns in the area according to the BLS (May 2025 median hourly wage for the metro).
| Trade | Davis-Bacon package | BLS median |
|---|---|---|
| Electricians | $26.72 – $87.55 | $30.96 an hour |
| Plumbers and pipefitters | $70.95 – $97.04 | $29.19 an hour |
| Carpenters | $17.60 – $83.47 | $30.96 an hour |
| Power equipment operators | $9.15 – $101.08 | $29.10 an hour |
| Ironworkers | $72.29 | not published |
| Roofers | $13.90 – $71.84 | $28.44 an hour |
Building construction
Determination CA20260016, modification 4, published September 3, 2026. 24 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIAN | $50.00 | $30.15 | $80.15 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER & STEAMFITTER | $54.50 | $42.54 | $97.04 | Union |
| SPRINKLER FITTER: FIRE | $49.69 | $29.72 | $79.41 | Union |
| Carpenters | ||||
| CARPENTER | $13.36 | $4.24 | $17.60 | Survey |
| Laborers | ||||
| LABORER | $7.83 | $2.86 | $10.69 | Survey |
| Power equipment operators | ||||
| POWER EQUIPMENT OPERATORS: LOADER | $9.65 | $0.62 | $10.27 | Survey |
| POWER EQUIPMENT OPERATORS: MOTOR GRADER | $11.19 | $0.62 | $11.81 | Survey |
| POWER EQUIPMENT OPERATORS: TRACTOR | $8.53 | $0.62 | $9.15 | Survey |
| Ironworkers | ||||
| IRONWORKER (FENCE ERECTOR) | $45.78 | $26.51 | $72.29 | Union |
| Sheet metal workers | ||||
| SHEET METAL WORKER (EXCLUDING METAL DECK AND SIDING) | $54.49 | $42.39 | $96.88 | Union |
| SHEET METAL WORKER (METAL DECK AND SIDING ONLY) | $44.45 | $35.55 | $80.00 | Union |
| Painters | ||||
| PAINTER | $9.87 | $0.00 | $9.87 | Survey |
| Roofers | ||||
| ROOFER | $10.05 | $3.85 | $13.90 | Survey |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 | $55.42 | Union |
| Bricklayers | ||||
| BRICKLAYER | $15.18 | $0.00 | $15.18 | Survey |
| Truck drivers | ||||
| TRUCK DRIVERS: DUMP TRUCK | $8.95 | $0.62 | $9.57 | Survey |
| TRUCK DRIVERS: WATER TRUCK | $7.50 | $0.62 | $8.12 | Survey |
Every other classification (7)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL) | $50.70 | $35.15 | $85.85 | Union |
| DRYWALL TAPER | $13.08 | $0.00 | $13.08 | Survey |
| FLOOR LAYER: CARPET | $10.72 | $1.76 | $12.48 | Survey |
| GLAZIER | $12.52 | $5.21 | $17.73 | Survey |
| HOD CARRIER: BRICK | $11.76 | $0.00 | $11.76 | Survey |
| HOD CARRIER: PLASTER | $9.00 | $1.55 | $10.55 | Survey |
| PLASTERER | $12.05 | $2.94 | $14.99 | Survey |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Residential construction
Determination CA20260009, modification 1, published May 18, 2026. 78 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIANS: ONE AND TWO-STORIESFRESNO, MADERA AND TULARE COUNTIES | $19.00 | $7.72 | $26.72 | Union |
| ELECTRICIAN: CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFBKERN COUNTY | $65.40 | $22.15 | $87.55 | Union |
| ELECTRICIANSAN JOAQUIN COUNTY | $49.45 | $31.96 | $81.41 | Union |
| ELECTRICIANMERCED AND STANISLAUS COUNTIES | $48.50 | $30.09 | $78.59 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER: SEWER & STORM DRAIN WORKKERN COUNTY | $48.84 | $23.58 | $72.42 | Union |
| PLUMBER: LANDSCAPE/IRRIGATION FITTERKERN COUNTY | $44.75 | $26.20 | $70.95 | Union |
| PLUMBER: ALL OTHER WORKKERN COUNTY | $48.83 | $22.73 | $71.56 | Union |
| Carpenters | ||||
| CARPENTER | $21.24 | $7.20 | $28.44 | Survey |
| Laborers | ||||
| LABORER, GENERAL | $7.25 | $0.00 | $7.25 | Survey |
| Power equipment operators | ||||
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1 | $63.06 | $34.69 | $97.75 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1 | $64.70 | $34.69 | $99.39 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1 | $66.39 | $34.69 | $101.08 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $54.69 | $34.69 | $89.38 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $56.71 | $34.69 | $91.40 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $57.79 | $34.69 | $92.48 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $58.88 | $34.69 | $93.57 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $60.15 | $34.69 | $94.84 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $61.36 | $34.69 | $96.05 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $62.69 | $34.69 | $97.38 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $64.09 | $34.69 | $98.78 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1 | $65.54 | $34.69 | $100.23 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) | $49.64 | $28.56 | $78.20 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) | $47.64 | $28.56 | $76.20 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) | $54.25 | $28.56 | $82.81 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) | $52.25 | $28.56 | $80.81 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) | $57.85 | $28.56 | $86.41 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) | $55.85 | $28.56 | $84.41 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $48.65 | $25.25 | $73.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $48.48 | $25.25 | $73.73 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $48.31 | $25.25 | $73.56 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $48.19 | $25.25 | $73.44 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $48.08 | $25.25 | $73.33 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $47.86 | $25.25 | $73.11 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $47.72 | $25.25 | $72.97 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $47.43 | $25.25 | $72.68 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $52.65 | $25.25 | $77.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $51.65 | $25.25 | $76.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $50.65 | $25.25 | $75.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $49.65 | $25.25 | $74.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $46.65 | $25.25 | $71.90 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 25 (KERN COUNTY SITE WORK ONLY) | $49.98 | $25.25 | $75.23 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 24 (KERN COUNTY SITE WORK ONLY) | $49.81 | $25.25 | $75.06 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 23 (KERN COUNTY SITE WORK ONLY) | $49.69 | $25.25 | $74.94 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 22 (KERN COUNTY SITE WORK ONLY) | $49.58 | $25.25 | $74.83 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 21 (KERN COUNTY SITE WORK ONLY) | $49.48 | $25.25 | $74.73 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 20 (KERN COUNTY SITE WORK ONLY) | $49.31 | $25.25 | $74.56 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 19 (KERN COUNTY SITE WORK ONLY) | $49.19 | $25.25 | $74.44 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 18 (KERN COUNTY SITE WORK ONLY) | $49.08 | $25.25 | $74.33 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 17 (KERN COUNTY SITE WORK ONLY) | $48.98 | $25.25 | $74.23 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 16 (KERN COUNTY SITE WORK ONLY) | $48.81 | $25.25 | $74.06 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 15 (KERN COUNTY SITE WORK ONLY) | $48.69 | $25.25 | $73.94 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 14 (KERN COUNTY SITE WORK ONLY) | $48.61 | $25.25 | $73.86 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 13 (KERN COUNTY SITE WORK ONLY) | $48.58 | $25.25 | $73.83 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 12 (KERN COUNTY SITE WORK ONLY) | $48.48 | $25.25 | $73.73 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 11 (KERN COUNTY SITE WORK ONLY) | $49.41 | $25.25 | $74.66 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 10 (KERN COUNTY SITE WORK ONLY) | $48.31 | $25.25 | $73.56 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)9 | $49.29 | $25.25 | $74.54 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)8 | $48.19 | $25.25 | $73.44 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)7 | $49.18 | $25.25 | $74.43 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)6 | $48.08 | $25.25 | $73.33 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)5 | $48.96 | $25.25 | $74.21 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)4 | $47.86 | $25.25 | $73.11 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)3 | $46.37 | $25.25 | $71.62 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)2 | $46.08 | $25.25 | $71.33 | Union |
| OPERATOR: POWER EQUIPMENT GROUP (KERN COUNTY SITE WORK ONLY)1 | $45.30 | $25.25 | $70.55 | Union |
| Painters | ||||
| PAINTERS: BRUSHMERCED, STANISLAUS & SAN JOAQUIN COUNTIES FOOTNOTES: SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 1… | $43.45 | $22.80 | $66.25 | Union |
| PAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORKKERN COUNTY: | $34.08 | $18.50 | $52.58 | Union |
| Roofers | ||||
| ROOFERFRESNO, KERN, MADERA AND TULARE COUNTIES | $45.76 | $16.86 | $62.62 | Union |
| ROOFERMERCED, SAN JOAQUIN AND STANISLAUS COUNTIES | $49.65 | $22.19 | $71.84 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER (SITE WORK ONLY)FRESNO, MADERA, MERCED, SAN JOAQUIN, STANISLAUS AND TULARE COUNTIES | $39.20 | $19.71 | $58.91 | Union |
| CEMENT MASON/CONCRETE FINISHER (SITE WORK ONLY) KERN COUNTY | $47.70 | $27.07 | $74.77 | Union |
| Bricklayers | ||||
| BRICKLAYER | $17.00 | $1.12 | $18.12 | Survey |
Every other classification (6)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| SOFT FLOOR LAYERFRESNO, MADERA AND TULARE COUNTIES | $38.53 | $23.19 | $61.72 | Union |
| SOFT FLOOR LAYERSAN JOAQUIN AND STANISLAUS COUNTIES | $48.54 | $26.59 | $75.13 | Union |
| SOFT FLOOR LAYERKERN COUNTY | $45.15 | $19.43 | $64.58 | Union |
| PLASTERER | $17.50 | $0.00 | $17.50 | Survey |
| LATHER | $15.00 | $0.00 | $15.00 | Survey |
| BRICK TENDER | $11.00 | $0.96 | $11.96 | Survey |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Highway and heavy construction
Determination CA20260021, modification 2, published May 18, 2026. 165 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIAN | $50.00 | $30.15 | $80.15 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER & STEAMFITTER | $51.65 | $41.59 | $93.24 | Union |
| Carpenters | ||||
| CARPENTERS: MILLWRIGHT | $47.92 | $32.41 | $80.33 | Union |
| CARPENTERS: JOURNEYMAN CARPENTER | $45.42 | $30.82 | $76.24 | Union |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $52.65 | $30.82 | $83.47 | Union |
| CARPENTERS (HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR… | $45.57 | $30.82 | $76.39 | Union |
| Laborers | ||||
| LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON IIINSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS | $34.06 | $27.30 | $61.36 | Union |
| LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON ILAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE | $36.56 | $27.30 | $63.86 | Union |
| LABORER: TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG… | $36.26 | $27.30 | $63.56 | Union |
| SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED… | $35.35 | $27.30 | $62.65 | Union |
| LABORERS:, WRECKING: GROUP 1FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $35.50 | $27.30 | $62.80 | Union |
| LABORERS:, GUNITE: GROUP 4FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $35.25 | $27.30 | $62.55 | Union |
| LABORERS:, GUNITE: GROUP 2FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $35.96 | $27.30 | $63.26 | Union |
| LABORERS:, GUNITE: GROUP 1FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $36.46 | $27.30 | $63.76 | Union |
| LABORERS:, GUNITE: GROUP 3FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $35.37 | $27.30 | $62.67 | Union |
| BE USED IN THE PERFORMANCE OF ""FORM STRIPPING, CLEANING AND… | $28.94 | $27.30 | $56.24 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $35.25 | $27.30 | $62.55 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $35.35 | $27.30 | $62.65 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $35.50 | $27.30 | $62.80 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-FFOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $36.08 | $27.30 | $63.38 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E | $36.05 | $27.30 | $63.35 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-CFOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $35.55 | $27.30 | $62.85 | Union |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-AFOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. LABORER CLASSIFICAT… | $35.72 | $27.30 | $63.02 | Union |
| LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST…per dayASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; MASONRY AND PLASTERER TENDER; CAST-IN-PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL T… | $36.20 | $27.30 | $63.50 | Union |
| GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction) | $35.25 | $27.30 | $62.55 | Union |
| GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment… | $28.94 | $27.30 | $56.24 | Union |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (TULARE COUNTY) | $46.41 | $27.72 | $74.13 | Union |
| TUNNEL AND SHAFT LABORERS: GROUP 5 | $44.42 | $27.72 | $72.14 | Union |
| TUNNEL AND SHAFT LABORERS: GROUP 4 | $44.96 | $27.72 | $72.68 | Union |
| TUNNEL AND SHAFT LABORERS: GROUP 3 | $45.41 | $27.72 | $73.13 | Union |
| TUNNEL AND SHAFT LABORERS: GROUP 2 | $45.66 | $27.72 | $73.38 | Union |
| TUNNEL AND SHAFT LABORERS: GROUP 1 | $45.89 | $27.72 | $73.61 | Union |
| UNDERGROUND UTILITY WORKER / LANDSCAPE FITTER | $36.01 | $18.50 | $54.51 | Union |
| Power equipment operators | ||||
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $42.89 | $31.15 | $74.04 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $49.14 | $31.15 | $80.29 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $43.11 | $31.15 | $74.26 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $50.82 | $31.15 | $81.97 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $43.38 | $31.15 | $74.53 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $52.64 | $31.15 | $83.79 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $42.50 | $31.15 | $73.65 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $44.73 | $31.15 | $75.88 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $47.47 | $31.15 | $78.62 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $58.09 | $32.53 | $90.62 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $59.23 | $32.53 | $91.76 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $60.37 | $32.53 | $92.90 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $61.70 | $32.53 | $94.23 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $65.43 | $32.53 | $97.96 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $62.96 | $32.53 | $95.49 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $58.19 | $32.53 | $90.72 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $59.33 | $32.53 | $91.86 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $60.47 | $32.53 | $93.00 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $61.80 | $32.53 | $94.33 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $65.53 | $32.53 | $98.06 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $63.06 | $32.53 | $95.59 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1 | $60.61 | $32.53 | $93.14 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1 | $65.56 | $32.53 | $98.09 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $64.34 | $32.53 | $96.87 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $61.30 | $32.53 | $93.83 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $55.49 | $32.53 | $88.02 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $57.70 | $32.53 | $90.23 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $58.84 | $32.53 | $91.37 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $61.30 | $32.53 | $93.83 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $62.57 | $32.53 | $95.10 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $65.43 | $32.53 | $97.96 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $66.96 | $32.53 | $99.49 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $42.89 | $31.15 | $74.04 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $49.14 | $31.15 | $80.29 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $43.11 | $31.15 | $74.26 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $50.82 | $31.15 | $81.97 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $43.38 | $31.15 | $74.53 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $52.64 | $31.15 | $83.79 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $42.50 | $31.15 | $73.65 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $44.73 | $31.15 | $75.88 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $47.47 | $31.15 | $78.62 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $58.09 | $32.53 | $90.62 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $59.23 | $32.53 | $91.76 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $60.37 | $32.53 | $92.90 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $61.70 | $32.53 | $94.23 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $65.43 | $32.53 | $97.96 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $62.96 | $32.53 | $95.49 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $58.19 | $32.53 | $90.72 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $59.33 | $32.53 | $91.86 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $60.47 | $32.53 | $93.00 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $61.80 | $32.53 | $94.33 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $65.53 | $32.53 | $98.06 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1 | $63.06 | $32.53 | $95.59 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1 | $60.61 | $32.53 | $93.14 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1 | $65.56 | $32.53 | $98.09 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $64.34 | $32.53 | $96.87 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $61.30 | $32.53 | $93.83 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $55.49 | $32.53 | $88.02 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $57.70 | $32.53 | $90.23 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $58.84 | $32.53 | $91.37 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $61.30 | $32.53 | $93.83 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $62.57 | $32.53 | $95.10 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $65.43 | $32.53 | $97.96 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $66.96 | $32.53 | $99.49 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) | $49.64 | $28.56 | $78.20 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) | $47.64 | $28.56 | $76.20 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) | $54.25 | $28.56 | $82.81 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) | $52.25 | $28.56 | $80.81 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) | $57.85 | $28.56 | $86.41 | Union |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) | $55.85 | $28.56 | $84.41 | Union |
| Ironworkers | ||||
| IRONWORKER (FENCE ERECTOR) | $45.78 | $26.51 | $72.29 | Union |
| Painters | ||||
| PAINTERFOOTNOTE: SANDBLAST/SPRAY PAINTING: $1.00 PER HOUR ADDITIONAL. WORK OVER 30 FEET (DOES NOT INCLUDE WORK FROM A LIFT): $1.00 PER HOUR ADDITIONAL | $36.57 | $22.69 | $59.26 | Union |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT… | $35.11 | $17.62 | $52.73 | Union |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT… | $40.83 | $17.62 | $58.45 | Union |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT… | $34.71 | $17.62 | $52.33 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 | $55.42 | Union |
| Bricklayers | ||||
| BRICKLAYER; MARBLE SETTER*THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE … | $45.53 | $20.29 | $65.82 | Union |
| Truck drivers | ||||
| TRUCK DRIVERS: GROUP 5FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE… | $44.56 | $34.28 | $78.84 | Union |
| TRUCK DRIVERS: GROUP 4FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE… | $44.21 | $34.28 | $78.49 | Union |
| TRUCK DRIVERS: GROUP 1FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE… | $43.26 | $34.28 | $77.54 | Union |
Every other classification (52)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES… | $35.31 | $12.75 | $48.06 | Union |
| ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL… | $64.56 | $25.07 | $89.63 | Union |
| BOILERMAKER | $45.60 | $38.99 | $84.59 | Union |
| MARBLE FINISHER | $42.06 | $19.80 | $61.86 | Union |
| TILE LAYER | $50.28 | $22.05 | $72.33 | Union |
| TILE FINISHER | $32.68 | $18.32 | $51.00 | Union |
| TERRAZZO WORKER/SETTER | $60.58 | $29.79 | $90.37 | Union |
| TERRAZZO FINISHER | $44.93 | $20.98 | $65.91 | Union |
| DIVER: MANIFOLD OPERATOR (STANDBY)DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. TH… | $59.51 | $34.69 | $94.20 | Union |
| DIVER: MANIFOLD OPERATOR (MIXED GAS)DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. TH… | $64.51 | $34.69 | $99.20 | Union |
| DIVER: DIVER WETDEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. TH… | $103.62 | $34.69 | $138.31 | Union |
| DIVER: DIVER TENDERDEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. TH… | $59.51 | $34.69 | $94.20 | Union |
| DIVER: DIVER STANDBYDEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. TH… | $60.51 | $34.69 | $95.20 | Union |
| DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIANDEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. TH… | $54.10 | $34.69 | $88.79 | Union |
| PILEDRIVER | $54.10 | $34.69 | $88.79 | Union |
| LINE CONSTRUCTION: (3) GROUNDMANHOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.76 | $21.76 | $62.52 | Union |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDE… | $53.30 | $22.26 | $75.56 | Union |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICERHOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $70.16 | $24.71 | $94.87 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $45.12 | $31.15 | $76.27 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $45.41 | $31.15 | $76.56 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $45.66 | $31.15 | $76.81 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $62.24 | $32.53 | $94.77 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $67.04 | $32.53 | $99.57 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $68.81 | $32.53 | $101.34 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $63.54 | $32.53 | $96.07 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $66.08 | $32.53 | $98.61 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $68.59 | $32.53 | $101.12 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $59.98 | $32.53 | $92.51 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $63.95 | $32.53 | $96.48 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $45.12 | $31.15 | $76.27 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $45.41 | $31.15 | $76.56 | Union |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1 | $45.66 | $31.15 | $76.81 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $62.24 | $32.53 | $94.77 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $67.04 | $32.53 | $99.57 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $68.81 | $32.53 | $101.34 | Union |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $63.54 | $32.53 | $96.07 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $66.08 | $32.53 | $98.61 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $68.59 | $32.53 | $101.12 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $59.98 | $32.53 | $92.51 | Union |
| OPERATOR: POWER EQUIPMENT, AREA 1FOOTNOTE: WORK SUSPENDED BY ROPES OR CABLES, OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL | $63.95 | $32.53 | $96.48 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTE… | $53.23 | $39.55 | $92.78 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ… | $56.53 | $39.55 | $96.08 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTE… | $57.65 | $39.55 | $97.20 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTE… | $62.61 | $39.55 | $102.16 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTE… | $51.23 | $39.55 | $90.78 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ… | $54.53 | $39.55 | $94.08 | Union |
| DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTE… | $60.61 | $39.55 | $100.16 | Union |
| DREDGING ( CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION…THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTE… | $55.65 | $39.55 | $95.20 | Union |
| IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL) | $50.70 | $35.15 | $85.85 | Union |
| PLASTERER TENDERWORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 | Union |
| TRUCK DRIVERS: GROUP 3FOOTNOTES: ARTICULATED DUMP TRUCK; BULK CEMENT SPREADER (WITH OR WITHOUT AUGER); DUMPCRETE TRUCK; SKID TRUCK (DEBRIS BOX); DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YARDAGE… | $43.86 | $34.28 | $78.14 | Union |
| INDUSTRIAL LIFT TRUCK (MECHANICAL TAILGATE); UTILITY AND… | $43.56 | $34.28 | $77.84 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Before you rely on a rate
These are federal Davis-Bacon rates for federal and federally assisted construction; state-funded work may follow California's own law. The contracting agency chooses which determination applies, and the one attached to the contract governs, even after a newer modification. Apprentices in registered programs may be paid a percentage of these rates. Nothing here is legal advice.
Source
U.S. Department of Labor, Wage and Hour Division, general wage determinations CA20260016, CA20260009, CA20260021, as published on SAM.gov and refreshed here weekly. Rates are shown exactly as published; the construction types are building, residential, highway, heavy. TradeSalary is not affiliated with the Department of Labor.