Prevailing wage rates in Orange County, CA
Davis-Bacon rates as of September 3, 2026, in the Los Angeles-Long Beach-Anaheim, CA BLS area
Electricians on federal building, highway and heavy jobs in Orange County must be paid at least $63.91 an hour plus $27.09 an hour in fringe benefits (CA20260024, modification 4, published July 14, 2026). Orange County has 2 active determinations covering building, residential, highway and heavy construction; every rate is below.
Prevailing rate vs. market pay
The Davis-Bacon package (rate plus fringe) across the county's determinations, beside what the trade earns in the area according to the BLS (May 2025 median hourly wage for the metro).
| Trade | Davis-Bacon package | BLS median |
|---|---|---|
| Electricians | $45.73 – $91.00 | $35.49 an hour |
| Plumbers and pipefitters | $68.45 – $92.25 | $34.19 an hour |
| Carpenters | $41.62 – $78.92 | $36.41 an hour |
| Power equipment operators | $70.55 – $108.85 | $44.66 an hour |
| Ironworkers | $72.29 | $37.52 an hour |
| Roofers | $55.44 – $73.36 | $30.56 an hour |
Building, highway and heavy construction
Determination CA20260024, modification 4, published July 14, 2026. 132 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| CABLE SPLICER | $63.91 | $27.09 | $91.00 | Union |
| ELECTRICIAN | $61.10 | $27.00 | $88.10 | Union |
| ELECTRICIAN: TRANSPORTATION SYSTEMS, TRAFFIC SIGNALS & STREET…SCOPE OF WORK: ELECTRICAL WORK ON PUBLIC STREETS, FREEWAYS, TOLL-WAYS, ETC, ABOVE OR BELOW GROUND. ALL WORK NECESSARY FOR THE INSTALLATION, RENOVATION, REPAIR OR REMOVAL OF INTELLIGENT TRANSPORTATION SYSTEMS, VIDEO SURVE… | $60.82 | $24.72 | $85.54 | Union |
| ELECTRICIAN: TRANSPORTATION SYSTEMS, TRAFFIC SIGNALS & STREET…SCOPE OF WORK: ELECTRICAL WORK ON PUBLIC STREETS, FREEWAYS, TOLL-WAYS, ETC, ABOVE OR BELOW GROUND. ALL WORK NECESSARY FOR THE INSTALLATION, RENOVATION, REPAIR OR REMOVAL OF INTELLIGENT TRANSPORTATION SYSTEMS, VIDEO SURVE… | $60.22 | $24.71 | $84.93 | Union |
| ELECTRICIAN: TRANSPORTATION SYSTEMS, TRAFFIC SIGNALS & STREET…SCOPE OF WORK: ELECTRICAL WORK ON PUBLIC STREETS, FREEWAYS, TOLL-WAYS, ETC, ABOVE OR BELOW GROUND. ALL WORK NECESSARY FOR THE INSTALLATION, RENOVATION, REPAIR OR REMOVAL OF INTELLIGENT TRANSPORTATION SYSTEMS, VIDEO SURVE… | $45.17 | $24.26 | $69.43 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER/PIPEFITTER(WORK ONLY ON NEW ADDITIONS AND REMODELING OF BARS, RESTAURANT, STORES AND COMMERCIAL BUILDINGS NOT TO EXCEED 5,000 SQ. FT. OF FLOOR SPACE) | $59.85 | $25.83 | $85.68 | Union |
| PLUMBER/PIPEFITTER (ALL OTHER WORK EXCEPT WORK ON NEW ADDITIONS… | $61.73 | $26.81 | $88.54 | Union |
| PLUMBER/PIPEFITTER (WORK ONLY ON STRIP MALLS, LIGHT COMMERCIAL… | $44.29 | $24.16 | $68.45 | Union |
| PLUMBER (LANDSCAPE/IRRIGATION FITTER) | $44.75 | $26.20 | $70.95 | Union |
| PLUMBER (SEWER & STORM DRAIN WORK) | $48.84 | $23.58 | $72.42 | Union |
| SPRINKLER FITTER (DOES NOT INCLUDE SAN CLEMENTE ISLAND, THE… | $50.79 | $29.80 | $80.59 | Union |
| SPRINKLER FITTER: FIRE (SAN CLEMENTE ISLAND, THE CITY OF SANTA… | $58.60 | $33.65 | $92.25 | Union |
| Carpenters | ||||
| CARPENTER: (1) CARPENTER, CABINET INSTALLER, INSULATION…FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT PORTI… | $52.24 | $26.18 | $78.42 | Union |
| CARPENTER: (2) MILLWRIGHTFOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT PORTI… | $52.24 | $26.68 | $78.92 | Union |
| CARPENTER: (3) PILEDRIVERMEN/DERRICK BARGEMAN, BRIDGE OR DOCK…ROCK BARGEMAN OR SCOWMAN, ROCKSLINGER, SHINGLER (COMMERCIAL) FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H… | $52.37 | $26.18 | $78.55 | Union |
| CARPENTER: (4) PNEUMATIC NAILER, POWER STAPLERFOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT PORTI… | $52.37 | $26.18 | $78.55 | Union |
| CARPENTER: (5)SAWFILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR T… | $52.34 | $26.18 | $78.52 | Union |
| CARPENTER: (6)SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED HOLE… | $45.37 | $25.43 | $70.80 | Union |
| CARPENTER: (7)TABLE POWER SAW OPERATOR FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRIL… | $52.34 | $26.18 | $78.52 | Union |
| Laborers | ||||
| ASBESTOS REMOVAL LABORERSCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AND TOXIC WASTE, ENCAPSULATION, ENCLOSURE AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND TOXI… | $46.48 | $25.93 | $72.41 | Union |
| LABORER, GUNITE: GROUP 1FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTC… | $55.88 | $23.77 | $79.65 | Union |
| LABORER, GUNITE: GROUP 2FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTC… | $54.93 | $23.77 | $78.70 | Union |
| LABORER, GUNITE: GROUP 3FOOTNOTE: GUNITE PREMIUM PAY: WORKERS WORKING FROM A BOSN'N'S CHAIR OR SUSPENDED FROM A ROPE OR CABLE SHALL RECEIVE 40 CENTS PER HOUR ABOVE THE FOREGOING APPLICABLE CLASSIFICATION RATES. WORKERS DOING GUNITE AND/OR SHOTC… | $51.39 | $23.77 | $75.16 | Union |
| LABORER GROUP 1 | $46.48 | $25.95 | $72.43 | Union |
| LABORER GROUP 2 | $47.03 | $25.95 | $72.98 | Union |
| LABORER GROUP 3 | $47.58 | $25.95 | $73.53 | Union |
| LABORER GROUP 4 | $49.13 | $25.95 | $75.08 | Union |
| LABORER GROUP 5 | $49.48 | $25.95 | $75.43 | Union |
| LABORER, TUNNEL: GROUP 1 | $53.60 | $25.74 | $79.34 | Union |
| LABORER, TUNNEL: GROUP 2 | $53.92 | $25.74 | $79.66 | Union |
| LABORER, TUNNEL: GROUP 3 | $54.38 | $25.74 | $80.12 | Union |
| LABORER, TUNNEL: GROUP 4 | $55.07 | $25.74 | $80.81 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW… | $47.94 | $20.86 | $68.80 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE… | $48.11 | $20.86 | $68.97 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL… | $49.96 | $20.86 | $70.82 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC… | $51.96 | $20.86 | $72.82 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 | $49.30 | $23.97 | $73.27 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 2TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT | $50.60 | $23.97 | $74.57 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 | $52.61 | $23.97 | $76.58 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 | $54.35 | $23.97 | $78.32 | Union |
| LABORER: PLASTER CLEAN-UP LABORERWORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $46.17 | $25.97 | $72.14 | Union |
| LABORER: PLASTER TENDERWORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $48.72 | $25.97 | $74.69 | Union |
| Power equipment operators | ||||
| OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING) | $67.90 | $40.95 | $108.85 | Union |
| OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING) | $61.93 | $40.95 | $102.88 | Union |
| OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING) | $61.82 | $40.95 | $102.77 | Union |
| OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON… | $61.27 | $40.95 | $102.22 | Union |
| OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND… | $60.73 | $40.95 | $101.68 | Union |
| OPERATOR, POWER EQUIPMENT: (6) BARGE MATE (DREDGING) | $61.34 | $40.95 | $102.29 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 1 | $63.40 | $33.20 | $96.60 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2 | $64.18 | $33.20 | $97.38 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $64.67 | $33.20 | $97.87 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $65.96 | $33.20 | $99.16 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $66.18 | $33.20 | $99.38 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 8ROCK DRILL OR SIMILAR TYPES; ROTARY DRILL OPERATOR (EXCLUDING CAISSON TYPE); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OV… | $66.29 | $33.20 | $99.49 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $66.58 | $33.20 | $99.78 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX M… | $66.68 | $33.20 | $99.88 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $66.71 | $33.20 | $99.91 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $66.79 | $33.20 | $99.99 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $66.91 | $33.20 | $100.11 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.08 | $33.20 | $100.28 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 18PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.18 | $33.20 | $100.38 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.29 | $33.20 | $100.49 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.41 | $33.20 | $100.61 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.58 | $33.20 | $100.78 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.68 | $33.20 | $100.88 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.79 | $33.20 | $100.99 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 24STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX M… | $67.91 | $33.20 | $101.11 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $68.08 | $33.20 | $101.28 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP1- Engineer oiler; Fork lift operator (includes loed, lull or similar types) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDE… | $64.75 | $33.20 | $97.95 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN,… | $65.53 | $33.20 | $98.73 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP3- A-frame or winch truck operator; Ross carrier operator (jobsite) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB… | $65.82 | $33.20 | $99.02 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBE… | $65.96 | $33.20 | $99.16 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP5 HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA… | $66.18 | $33.20 | $99.38 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP6 Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar… | $66.29 | $33.20 | $99.49 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP7 PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST OPERATOR (3 DRUM) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATO… | $66.41 | $33.20 | $99.61 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP8 Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and inclu… | $66.58 | $33.20 | $99.78 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP9 Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar t… | $66.75 | $33.20 | $99.95 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP1- Skiploader (wheel type up to 3/4 yd. without attachment) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point … | $65.25 | $33.20 | $98.45 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely N… | $66.03 | $33.20 | $99.23 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP3- Dinkey locomotive or motorperson (up to and including 10 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, … | $66.32 | $33.20 | $99.52 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP4- Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and in… | $66.46 | $33.20 | $99.66 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP5- Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and simila… | $66.68 | $33.20 | $99.88 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irw… | $66.79 | $33.20 | $99.99 | Union |
| OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval… | $66.91 | $33.20 | $100.11 | Union |
| Ironworkers | ||||
| IRONWORKER (FENCE ERECTOR) | $45.78 | $26.51 | $72.29 | Union |
| Sheet metal workers | ||||
| SHEET METAL WORKER: (1) COMMERCIAL - NEW CONSTRUCTION AND… | $59.31 | $30.43 | $89.74 | Union |
| Painters | ||||
| PAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK | $38.52 | $18.64 | $57.16 | Union |
| Roofers | ||||
| ROOFERFOOTNOTE: PITCH PREMIUM: WORK ON WHICH EMPLOYEES ARE EXPOSED TO PITCH FUMES OR REQUIRED TO HANDLE PITCH, PITCH BASE OR PITCH IMPREGNATED PRODUCTS, OR ANY MATERIAL CONTAINING COAL TAR PITCH, THE ENTIRE ROOFING CREW SHALL … | $52.63 | $20.73 | $73.36 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $47.70 | $27.07 | $74.77 | Union |
| Bricklayers | ||||
| BRICKLAYER; MARBLE SETTER*THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE … | $45.53 | $20.29 | $65.82 | Union |
| Truck drivers | ||||
| TRUCK DRIVER GROUP1 TRUCK DRIVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO &… | $41.59 | $35.69 | $77.28 | Union |
| TRUCK DRIVER GROUP2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; TRUCK MOUNTED BROOM WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [2… | $41.74 | $35.69 | $77.43 | Union |
| TRUCK DRIVER GROUP3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TRUCK - 2 AXLE; DUMP TRUCK, LESS THAN 16 YDS. WATER LEVEL; EROSION CONTROL DRIVER WORK ON A… | $41.87 | $35.69 | $77.56 | Union |
| TRUCK DRIVER GROUP4 DRIVER OF TRANSIT MIX TRUCK, UNDER 3 YDS.; DUMPCRETE TRUCK, LESS THAN 6-1/2 YDS. WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS … | $42.06 | $35.69 | $77.75 | Union |
| TRUCK DRIVER GROUP5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON ($0.50 ADDITIONAL FOR TIRE PERSON); PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUCK AND PLASTIC FUSION, LIMITED TO PIPELINE AND UTILITY WORK;… | $42.09 | $35.69 | $77.78 | Union |
| TRUCK DRIVER GROUP6 TRANSIT MIX TRUCK, 3 YDS. OR MORE; DUMPCRETE TRUCK, 6-1/2 YDS. WATER LEVEL AND OVER; VEHICLE OR COMBINATION OF VEHICLES - 4 OR MORE AXLES; OIL SPREADER TRUCK; DUMP TRUCK, 16 YDS. TO 25 YDS. WATER LEVEL WORK ON ALL MILI… | $42.12 | $35.69 | $77.81 | Union |
| TRUCK DRIVER GROUP7 | $42.37 | $35.69 | $78.06 | Union |
| TRUCK DRIVER GROUP8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, E… | $42.62 | $35.69 | $78.31 | Union |
| TRUCK DRIVER GROUP9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FO… | $42.82 | $35.69 | $78.51 | Union |
| TRUCK DRIVER GROUP 10WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAI… | $43.12 | $35.69 | $78.81 | Union |
| TRUCK DRIVER GROUP 11- $1.25 ADDITIONAL WHEN OPERATING WINCH OR SIMILAR SPECIAL ATTACHMENTS WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FAC… | $43.62 | $35.69 | $79.31 | Union |
| TRUCK DRIVER GROUP 12$3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, BRIDGEPORT, PO… | $44.05 | $35.69 | $79.74 | Union |
Every other classification (30)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $56.32 | $26.52 | $82.84 | Union |
| FIRE STOP TECHNICIAN(APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS) | $39.94 | $20.65 | $60.59 | Union |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $23.52 | $13.37 | $36.89 | Union |
| MARBLE FINISHER | $43.38 | $15.36 | $58.74 | Union |
| TILE FINISHER | $37.96 | $13.77 | $51.73 | Union |
| TILE LAYER | $51.82 | $19.32 | $71.14 | Union |
| TERRAZZO FINISHER | $42.11 | $14.67 | $56.78 | Union |
| TERRAZZO WORKER/SETTER | $49.62 | $15.26 | $64.88 | Union |
| DRYWALL (DRYWALL INSTALLER/LATHER) | $52.24 | $26.18 | $78.42 | Union |
| DRYWALL (STOCKER/SCRAPPER) | $21.45 | $11.27 | $32.72 | Union |
| MODULAR FURNITURE INSTALLER | $25.00 | $13.06 | $38.06 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS & SYSTEMS WORK (EXCLUDES ANY WORK ON INTELLIGENT TRANSPORTATION SYSTEMS OR CCTV HIGHWAY SYSTEMS) SCOPE OF WORK THE WORK COVERED SHALL INCLUDE THE INSTALLATION, TESTING, SERVICE AND MAINTENANCE, OF THE FOLL… | $46.47 | $18.47 | $64.94 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS AND SYSTEMS WORK SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SEC… | $46.47 | $18.47 | $64.94 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS & SYSTEMS WORK (EXCLUDES ANY WORK ON INTELLIGENT TRANSPORTATION SYSTEMS OR CCTV HIGHWAY SYSTEMS) SCOPE OF WORK THE WORK COVERED SHALL INCLUDE THE INSTALLATION, TESTING, SERVICE AND MAINTENANCE, OF THE FOLL… | $49.73 | $17.54 | $67.27 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS AND SYSTEMS WORK SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATIONAL, SEC… | $49.73 | $17.54 | $67.27 | Union |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICERHOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $70.16 | $24.71 | $94.87 | Union |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDE… | $53.30 | $22.26 | $75.56 | Union |
| LINE CONSTRUCTION: (3) GROUNDMANHOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.76 | $21.76 | $62.52 | Union |
| ELEVATOR MECHANICFOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S D… | $69.43 | $38.44 | $107.87 | Union |
| OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 10PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $66.41 | $33.20 | $99.61 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $67.75 | $33.20 | $100.95 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $68.75 | $33.20 | $101.95 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BA… | $69.75 | $33.20 | $102.95 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING… | $70.75 | $33.20 | $103.95 | Union |
| IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL) | $50.70 | $35.15 | $85.85 | Union |
| BRICK TENDER | $42.60 | $22.13 | $64.73 | Union |
| DRYWALL FINISHER/TAPER | $49.33 | $26.82 | $76.15 | Union |
| GLAZIERFOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDOR, FROM THE THIRD (3RD) FLOOR AND UP ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF THE BUILDING FROM A SWING STAGE OR ANY SUSPENDED CONTRIVANCE, FROM THE GROU… | $53.05 | $30.64 | $83.69 | Union |
| SOFT FLOOR LAYER | $45.15 | $19.43 | $64.58 | Union |
| PLASTERER | $47.37 | $19.64 | $67.01 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Residential construction
Determination CA20260017, modification 4, published September 3, 2026. 169 classifications.
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| Electricians | ||||
| ELECTRICIAN: DOES NOT INCLUDE FIRE ALARM, HOLD-UP ALARM…LOS ANGELES | $37.63 | $8.41 | $46.04 | Union |
| ELECTRICIANS (SANTA BARBARA COUNTY)WORK AT VANDENBERG AFB: $3.75 ADDITIONAL PER HOUR | $41.00 | $4.73 | $45.73 | Union |
| ELECTRICIAN(RIVERSIDE) | $57.26 | $32.83 | $90.09 | Union |
| ELECTRICIAN(ORANGE) | $36.66 | $11.26 | $47.92 | Union |
| ELECTRICIAN (SAN BERNARDINO) | $37.63 | $9.57 | $47.20 | Union |
| ELECTRICIAN: 1 TO 3 STORIES(IMPERIAL) | $40.50 | $8.18 | $48.68 | Union |
| ELECTRICIAN(SAN LUIS OBISPO) | $55.50 | $24.42 | $79.92 | Union |
| CABLE SPLICERALL WORK WITHIN 32 ROAD MILES OR LESS FROM THE NEAREST BASE POINT (VENTURA) ALL WORK MORE THAN 32 ROAD MILES FROM NEAREST BASE POINT: ADD $5.00 TO THE BASIC HOURLY RATE. BASE POINTS: THE MAIN POST OFFICE IN THE CITIES OF… | $58.40 | $31.72 | $90.12 | Union |
| ELECTRICIANALL WORK WITHIN 32 ROAD MILES OR LESS FROM THE NEAREST BASE POINT (VENTURA) ALL WORK MORE THAN 32 ROAD MILES FROM NEAREST BASE POINT: ADD $5.00 TO THE BASIC HOURLY RATE. BASE POINTS: THE MAIN POST OFFICE IN THE CITIES OF… | $53.09 | $31.56 | $84.65 | Union |
| Plumbers and pipefitters | ||||
| PLUMBER/PIPEFITTER (RESIDENTIAL) | $48.83 | $22.73 | $71.56 | Union |
| PLUMBER (LANDSCAPE/IRRIGATION FITTER) | $44.75 | $26.20 | $70.95 | Union |
| PLUMBER (SEWER & STORM DRAIN WORK) | $48.84 | $23.58 | $72.42 | Union |
| SPRINKLER FITTER: (AREA 1 | $50.79 | $29.80 | $80.59 | Union |
| SPRINKLER FITTER: (AREA 2 | $49.69 | $29.72 | $79.41 | Union |
| SPRINKLER FITTER (LOS ANGELES COUNTY (THE CITY OF POMONA… | $58.60 | $33.65 | $92.25 | Union |
| Carpenters | ||||
| CARPENTER, INSULATION INSTALLER(WORK ON WOOD FRAME SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 4 STORIES) | $25.66 | $15.96 | $41.62 | Union |
| Laborers | ||||
| LABORER GROUP 1 | $35.24 | $20.09 | $55.33 | Union |
| LABORER GROUP 2 | $35.79 | $20.09 | $55.88 | Union |
| LABORER GROUP 3 | $36.34 | $20.09 | $56.43 | Union |
| LABORER GROUP 4AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETIN… | $37.89 | $20.09 | $57.98 | Union |
| LABORER GROUP 5 | $38.24 | $20.09 | $58.33 | Union |
| LABORER GROUP 1 | $39.23 | $23.30 | $62.53 | Union |
| LABORER GROUP 2 | $39.78 | $23.30 | $63.08 | Union |
| LABORER GROUP 3 | $40.33 | $23.30 | $63.63 | Union |
| LABORER GROUP 4 (LOS ANGELES COUNTY)ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, … | $41.88 | $23.30 | $65.18 | Union |
| LABORER GROUP 5 | $42.23 | $23.30 | $65.53 | Union |
| ASBESTOS REMOVAL LABORERSCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS CONTAINING MATERIAL AND TOXIC WASTE (INCLUDING LEAD ABATEMENT AND ANY OTHER TOXIC MATERIAL), ENCAPSULATION, ENCLOSURE… | $46.48 | $25.93 | $72.41 | Union |
| LABORERS: (1) CLEANUP, FENCING (CHAIN LINK OR WOOD), LANDSCAPINGRESIDENTIAL, 3 STORIES AND UNDER | $45.00 | $22.70 | $67.70 | Union |
| LABORERS: (2) ALL OTHER WORKRESIDENTIAL, 3 STORIES AND UNDER | $46.00 | $22.70 | $68.70 | Union |
| LABORER GROUP 1 | $35.24 | $20.09 | $55.33 | Union |
| LABORER GROUP 2 | $35.79 | $20.09 | $55.88 | Union |
| LABORER GROUP 3 | $36.34 | $20.09 | $56.43 | Union |
| LABORER GROUP 4AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETIN… | $37.89 | $20.09 | $57.98 | Union |
| LABORER GROUP 5 | $38.24 | $20.09 | $58.33 | Union |
| LABORER GROUP 1 | $35.24 | $20.09 | $55.33 | Union |
| LABORER GROUP 2 | $35.79 | $20.09 | $55.88 | Union |
| LABORER GROUP 3 | $36.34 | $20.09 | $56.43 | Union |
| LABORER GROUP 4AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETIN… | $37.89 | $20.09 | $57.98 | Union |
| LABORER GROUP 5 | $38.24 | $20.09 | $58.33 | Union |
| LABORER GROUP 1 | $35.24 | $20.09 | $55.33 | Union |
| LABORER GROUP 2 | $35.79 | $20.09 | $55.88 | Union |
| LABORER GROUP 3 | $36.34 | $20.09 | $56.43 | Union |
| LABORER GROUP 4AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETIN… | $37.89 | $20.09 | $57.98 | Union |
| LABORER GROUP 5 | $38.24 | $20.09 | $58.33 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW… | $47.94 | $20.86 | $68.80 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE… | $48.11 | $20.86 | $68.97 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL… | $49.96 | $20.86 | $70.82 | Union |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC… | $51.96 | $20.86 | $72.82 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 | $49.30 | $23.97 | $73.27 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 2TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT | $50.60 | $23.97 | $74.57 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 | $52.61 | $23.97 | $76.58 | Union |
| LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 | $54.35 | $23.97 | $78.32 | Union |
| LABORER GROUP 1 | $35.24 | $20.09 | $55.33 | Union |
| LABORER GROUP 2 | $35.79 | $20.09 | $55.88 | Union |
| LABORER GROUP 3 | $36.34 | $20.09 | $56.43 | Union |
| LABORER GROUP 4AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER; CONCRETE SAW PERSON, CUTTING WALLS OR FLAT WORK, SCORING OLD OR NEW CONCRETE; CRIBBER, SHORER, LAGGING, SHEETIN… | $37.89 | $20.09 | $57.98 | Union |
| LABORER GROUP 5BLASTER | $38.24 | $20.09 | $58.33 | Union |
| LABORERS: PLASTER CLEAN-UP LABORER (1 TO 3 STORIES)WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAV… | $36.92 | $23.32 | $60.24 | Union |
| LABORERS: PLASTER CLEAN-UP LABORER (4 STORIES)WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAV… | $36.92 | $23.32 | $60.24 | Union |
| LABORERS: PLASTER TENDER (1 TO 3 STORIES)WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAV… | $39.47 | $23.32 | $62.79 | Union |
| LABORERS: PLASTER TENDER (4 STORIES)WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, GEORGE AFB, MARINE CORPS AIR STATION-29 PALMS, IMPERIAL BEACH NAV… | $39.47 | $23.32 | $62.79 | Union |
| Power equipment operators | ||||
| OPERATOR: POWER EQUIPMENT GROUP 1 | $45.30 | $25.25 | $70.55 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 11PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.41 | $25.25 | $74.66 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 12PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.48 | $25.25 | $74.73 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 13PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.58 | $25.25 | $73.83 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 14PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.61 | $25.25 | $73.86 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 15PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.69 | $25.25 | $73.94 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 16PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.81 | $25.25 | $74.06 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 17PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.98 | $25.25 | $74.23 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 18PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.08 | $25.25 | $74.33 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 19PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.19 | $25.25 | $74.44 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 2 | $46.08 | $25.25 | $71.33 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 20PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.31 | $25.25 | $74.56 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 21PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.48 | $25.25 | $74.73 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 22PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.58 | $25.25 | $74.83 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 23PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.69 | $25.25 | $74.94 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 24PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.81 | $25.25 | $75.06 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 25PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.98 | $25.25 | $75.23 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 3PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $46.37 | $25.25 | $71.62 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 4PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $47.86 | $25.25 | $73.11 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 5PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.96 | $25.25 | $74.21 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 6PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.08 | $25.25 | $73.33 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 7PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.18 | $25.25 | $74.43 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 8PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.19 | $25.25 | $73.44 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 9PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.29 | $25.25 | $74.54 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP1: ENGINEER OILER; FORK LIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VAND… | $46.65 | $25.25 | $71.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP2: TRUCK CRANE OILER PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN… | $47.43 | $25.25 | $72.68 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP3: A-FRAME OR WINCH TRUCK OPERATOR; ROSS CARRIER OPERATOR (JOBSITE) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AF… | $47.72 | $25.25 | $72.97 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP4: BRIDGE-TYPE UNLOADER AND TURNTABLE OPERATOR; HELICOPTER HOIST OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENB… | $47.86 | $25.25 | $73.11 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP5: HYDRAULIC BOOM TRUCK; STINGER CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER HOIST OPERATOR (1 DRUM) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHI… | $48.08 | $25.25 | $73.33 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP6: BRIDGE CRANE OPERATOR; CRETOR CRANE OPERATOR; HOIST OPERATOR (CHICAGO BOOM AND SIMILAR TYPE); LIFT MOBILE OPERATOR; LIFT SLAB MACHINE OPERATOR (VAGTBORG AND SIMILAR TYPES); MATERIAL HOIST AND/OR MANLIFT OPERATOR; POLA… | $48.19 | $25.25 | $73.44 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP7: PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU. YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST OPERATOR (3 DRUM) PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERAT… | $48.31 | $25.25 | $73.56 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP8: CRANE OPERATOR (UP TO AND INCLUDING 25 TON CAPACITY); CRAWLER TRANSPORTER OPERATOR; DERRICK BARGE OPERATOR (UP TO AND INCLUDING 25 TON CAPACITY); HOIST OPERATOR, STIFF LEGS, GUY DERRICK OR SIMILAR TYPE (UP TO AND INCL… | $48.48 | $25.25 | $73.73 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP9: CRANE OPERATOR (OVER 25 TONS AND UP TO AND INCLUDING 50 TONS MRC); DERRICK BARGE OPERATOR (OVER 25 TONS UP TO AND INCLUDING 50 TONS MRC); HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR, STIFF LEGS, GUY DERRICK OR SIMILAR … | $48.65 | $25.25 | $73.90 | Union |
| Ironworkers | ||||
| IRONWORKER (FENCE ERECTOR) | $45.78 | $26.51 | $72.29 | Union |
| Sheet metal workers | ||||
| SHEET METAL WORKER (WORK ON GENERAL SHEET METAL AND HEATING AND… | $29.54 | $19.09 | $48.63 | Union |
| SHEET METAL WORKER (WORK ON GENERAL SHEET METAL AND HEATING AND… | $33.10 | $10.81 | $43.91 | Union |
| SHEET METAL WORKER(IMPERIAL) | $51.45 | $30.92 | $82.37 | Union |
| SHEET METAL WORKER(SAN LUIS OBISPO, SANTA BARBARA AND VENTURA) HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, PRESIDENT'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPDENDENCE DAY, LABOR DAY, VETERANS DAY,THANKISGIVING DAY & FRIDAY AFTER, CHRI… | $55.32 | $35.87 | $91.19 | Union |
| Painters | ||||
| PAINTER, INCLUDING LEAD ABATEMENT: (1) REPAINT(SAN LUIS OBISPO, SANTA BARBARA & VENTURA) | $25.40 | $15.87 | $41.27 | Union |
| PAINTER, INCLUDING LEAD ABATEMENT: (1) REPAINTIMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO | $28.59 | $15.97 | $44.56 | Union |
| PAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK(SAN LUIS OBISPO, SANTA BARBARA & VENTURA) | $30.04 | $16.03 | $46.07 | Union |
| PAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORKIMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO | $32.12 | $16.09 | $48.21 | Union |
| PAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIALIMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO | $34.02 | $16.49 | $50.51 | Union |
| PAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIALSAN LUIS OBISPO, SANTA BARBARA & VENTURA | $34.02 | $16.49 | $50.51 | Union |
| Roofers | ||||
| ROOFER(LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA) | $51.58 | $20.73 | $72.31 | Union |
| ROOFER(IMPERIAL) | $42.80 | $12.64 | $55.44 | Union |
| Cement masons | ||||
| CEMENT MASON/CONCRETE FINISHER | $47.70 | $27.07 | $74.77 | Union |
| Bricklayers | ||||
| BRICKLAYER; MARBLE SETTER (LOS ANGELES COUNTY)*THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE … | $50.07 | $20.29 | $70.36 | Union |
| BRICKLAYER; MARBLE SETTER (ORANGE COUNTY)*THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE … | $50.07 | $20.29 | $70.36 | Union |
| BRICKLAYER; MARBLE SETTER (RIVERSIDE & SAN BERNARDINO COUNTIES) | $50.07 | $20.29 | $70.36 | Union |
| BRICKLAYER; MARBLE SETTER (VENTURA COUNTY)*THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE … | $50.07 | $20.29 | $70.36 | Union |
| BRICKLAYER; MARBLE SETTER(IMPERIAL) | $58.81 | $19.14 | $77.95 | Union |
| BRICKLAYER; MARBLE SETTER (SAN LUIS OBISPO AND SANTA BARBARA…*THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE … | $50.07 | $20.29 | $70.36 | Union |
| Truck drivers | ||||
| TRUCK DRIVERS: GROUP1 TRUCK DRIVER WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, GEORGE AFB, MARINE CORPS LOGISTICS BASE AT NEBO &… | $41.59 | $35.69 | $77.28 | Union |
| TRUCK DRIVERS: GROUP2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; TRUCK MOUNTED BROOM WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARI… | $41.74 | $35.69 | $77.43 | Union |
| TRUCK DRIVERS: GROUP3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TRUCK - 2 AXLE; DUMP TRUCK, LESS THAN 16 YDS. WATER LEVEL; EROSION CONTROL DRIVER WORK ON A… | $41.87 | $35.69 | $77.56 | Union |
| TRUCK DRIVERS: GROUP4 DRIVER OF TRANSIT MIX TRUCK, UNDER 3 YDS.; DUMPCRETE TRUCK, LESS THAN 6-1/2 YDS. WATER LEVEL WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENT… | $42.06 | $35.69 | $77.75 | Union |
| TRUCK DRIVERS: GROUP5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON ($0.50 ADDITIONAL FOR TIRE PERSON); PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUCK AND PLASTIC FUSION, LIMITED TO PIPELINE AND UTILITY WORK;… | $42.09 | $35.69 | $77.78 | Union |
| TRUCK DRIVERS: GROUP6 TRANSIT MIX TRUCK, 3 YDS. OR MORE; DUMPCRETE TRUCK, 6-1/2 YDS. WATER LEVEL AND OVER; VEHICLE OR COMBINATION OF VEHICLES - 4 OR MORE AXLES; OIL SPREADER TRUCK; DUMP TRUCK, 16 YDS. TO 25 YDS. WATER LEVEL WORK ON ALL MILI… | $42.12 | $35.69 | $77.81 | Union |
| TRUCK DRIVERS: GROUP7 | $42.37 | $35.69 | $78.06 | Union |
| TRUCK DRIVERS: GROUP8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, … | $42.62 | $35.69 | $78.31 | Union |
| TRUCK DRIVERS: GROUP9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, GE… | $42.82 | $35.69 | $78.51 | Union |
| TRUCK DRIVERS: GROUP 10WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, GEORGE AFB, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAI… | $43.12 | $35.69 | $78.81 | Union |
| TRUCK DRIVERS: GROUP 11- $1.25 ADDITIONAL WHEN OPERATING WINCH OR SIMILAR SPECIAL ATTACHMENTS WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT … | $43.62 | $35.69 | $79.31 | Union |
| TRUCK DRIVERS: GROUP 12- $3.00 PER HOUR ADDITIONAL: [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, GEORGE AFB, MARINE CORPS LOGISTICS BASE AT NEBO & YERMO, MOUNTAIN WARFARE TRAINING CENTER, … | $44.05 | $35.69 | $79.74 | Union |
Every other classification (43)
| Classification | Rate | Fringe | Total | Basis |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $56.32 | $26.52 | $82.84 | Union |
| FIRE STOP TECHNICIAN(APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS) | $39.94 | $20.65 | $60.59 | Union |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $23.52 | $13.37 | $36.89 | Union |
| MARBLE FINISHER | $43.38 | $15.36 | $58.74 | Union |
| TILE FINISHER | $37.96 | $13.77 | $51.73 | Union |
| TILE LAYER(SAN LUIS OBISPO AND SANTA BARBARA) | $51.82 | $19.32 | $71.14 | Union |
| TILE LAYER(IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO & VENTURA) | $51.82 | $19.32 | $71.14 | Union |
| TERRAZZO FINISHER | $42.11 | $14.67 | $56.78 | Union |
| TERRAZZO WORKER/SETTER | $49.62 | $15.26 | $64.88 | Union |
| DRYWALL: DRYWALL INSTALLER/LATHER: (1)WORK ON WOOD-FRAMED SINGLE FAMILY HOMES, AND WOOD-FRAMED APARTMENT BUILDINGS UP TO AND INCLUDING 4 STORIES | $32.14 | $16.28 | $48.42 | Union |
| DRYWALL: DRYWALL INSTALLER/LATHER: (2)ALL OTHER WORK | $51.60 | $16.28 | $67.88 | Union |
| DRYWALL: STOCKER/SCRAPPER: (1)WORK ON WOOD-FRAMED SINGLE FAMILY HOMES, AND WOOD-FRAMED APARTMENT BUILDINGS UP TO AND INCLUDING 4 STORIES | $22.16 | $8.62 | $30.78 | Union |
| DRYWALL: STOCKER/SCRAPPER: (2)ALL OTHER WORK | $22.16 | $8.62 | $30.78 | Union |
| MODULAR FURNITURE INSTALLER | $25.00 | $13.06 | $38.06 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS AND SYSTEMS WORK (LOS ANGELES COUNTY) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERC… | $46.47 | $18.47 | $64.94 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS AND SYSTEMS WORK (SANTA BARBARA COUNTY) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMME… | $48.13 | $17.49 | $65.62 | Union |
| COMMUNICATIONS SYSTEM INSTALLERCOMMUNICATIONS AND SYSTEMS WORK (RIVERSIDE AND SAN BERNARDINO COUNTIES) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND … | $45.23 | $20.47 | $65.70 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERSAN LUIS OBISPO COUNTY | $49.73 | $17.54 | $67.27 | Union |
| COMMUNICATIONS SYSTEM: INSTALLERCOMMUNICATIONS AND SYSTEMS WORK (VENTURA COUNTY ONLY) SCOPE OF WORK: INSTALLATION, TESTING, SERVICE AND MAINTENANCE OF SYSTEMS UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMER… | $46.47 | $19.22 | $65.69 | Union |
| ELEVATOR MECHANIC(SAN LUIS OBISPO) FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLI… | $84.05 | $38.44 | $122.49 | Union |
| ELEVATOR MECHANICIMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SANTA BARBARA AND VENTURA FOOTNOTE: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF S… | $69.43 | $38.44 | $107.87 | Union |
| OPERATOR: POWER EQUIPMENT GROUP 10PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $48.31 | $25.25 | $73.56 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $49.65 | $25.25 | $74.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $50.65 | $25.25 | $75.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…$10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE C… | $51.65 | $25.25 | $76.90 | Union |
| OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING…PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWJNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE B… | $52.65 | $25.25 | $77.90 | Union |
| IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL) | $50.70 | $35.15 | $85.85 | Union |
| BRICK TENDER (SAN LUIS OBISPO AND SANTA BARBARA COUNTIES) | $42.60 | $22.13 | $64.73 | Union |
| BRICK TENDER (LOS ANGELES COUNTY) | $42.60 | $22.13 | $64.73 | Union |
| BRICK TENDER (VENTURA COUNTY) | $42.60 | $22.13 | $64.73 | Union |
| BRICK TENDER (ORANGE COUNTY) | $42.60 | $22.13 | $64.73 | Union |
| BRICK TENDER (SAN BERNARDINO COUNTY) | $42.60 | $22.13 | $64.73 | Union |
| BRICK TENDER (IMPERIAL AND RIVERSIDE COUNTIES) | $42.60 | $22.13 | $64.73 | Union |
| DRYWALL FINISHER/TAPERIMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA COUNTIES | $32.27 | $14.70 | $46.97 | Union |
| GLAZIER(IMPERIAL) | $52.90 | $22.16 | $75.06 | Union |
| GLAZIER(LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SANTA BARBARA AND VENTURA) FOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDO, FROM THE THIRD (3RD) FLOOR AND UP. ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF… | $53.05 | $30.64 | $83.69 | Union |
| SOFT FLOOR LAYER (IMPERIAL) | $40.77 | $19.37 | $60.14 | Union |
| GLAZIER(SAN LUIS OBISPO) | $49.22 | $30.47 | $79.69 | Union |
| SOFT FLOOR LAYERLOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA | $45.15 | $19.43 | $64.58 | Union |
| PLASTERER: 1 - 3 STORIESIMPERIAL, KERN, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA | $44.34 | $19.64 | $63.98 | Union |
| PLASTERER: 4-STORIESIMPERIAL, KERN, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA | $47.37 | $19.64 | $67.01 | Union |
| REFRIGERATION MECHANIC: REFRIGERATION FITTER(LOS ANGELES AND ORANGE) | $57.65 | $25.01 | $82.66 | Union |
| SHEET METAL: TECHNICIANIMPERIAL SHEET METAL TECHNICIAN - SCOPE: A. EXISTING RESIDENTIAL BUILDINGS, BOTH SINGLE AND MULTI-FAMILY, WHERE EACH UNIT IS HEATED AND/OR COOLED BY A SEPARATE SYSTEM B. NEW SINGLE FAMILY RESIDENTIAL BUILDINGS INCLUDING … | $38.65 | $10.31 | $48.96 | Union |
Rate and fringe are per hour unless a row says per day. Total is the rate plus the fringe. Union rows come from a collective bargaining agreement; survey rows from a Department of Labor wage survey, which can be years old.
Before you rely on a rate
These are federal Davis-Bacon rates for federal and federally assisted construction; state-funded work may follow California's own law. The contracting agency chooses which determination applies, and the one attached to the contract governs, even after a newer modification. Apprentices in registered programs may be paid a percentage of these rates. Nothing here is legal advice.
Source
U.S. Department of Labor, Wage and Hour Division, general wage determinations CA20260024, CA20260017, as published on SAM.gov and refreshed here weekly. Rates are shown exactly as published; the construction types are building, residential, highway, heavy. TradeSalary is not affiliated with the Department of Labor.